Lathom solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Lathom solar farm is a cancelled solar photovoltaic (PV) farm in County of Newell, Alberta, Canada.
Project Details
Table 1: Phase-level project details for Lathom solar farm
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Cancelled[1] | 120 MWac[2] | PV[2] | Greengate Power CORP[2] | Lathom Solar LP[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Lathom solar farm
Location | Coordinates (WGS 84) |
---|---|
County of Newell, Alberta, Canada[2] | 50.7248, -112.2359 (exact)[2] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References