Lederata Energy solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Lederata Energy solar farm is an announced solar photovoltaic (PV) farm in Požarevac, Braničevo District, Serbia.
Project Details
Table 1: Phase-level project details for Lederata Energy solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Announced[1] | 2027 (planned)[2][1] | 50 MW[1] | PV[1] | CWP Global [100%][1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Lederata Energy solar farm
Location | Coordinates (WGS 84) |
---|---|
Požarevac, Braničevo District, Serbia[3][1] | 44.6155, 21.1761 (approximate)[3][1] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20240126041838/https://balkangreenenergynews.com/cwp-global-developing-first-hybrid-power-plant-project-in-serbia/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://ems.rs/wp-content/uploads/2023/06/20230630-proizvodjaci-Spisak-prikljucenja.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://goo.gl/maps/aZJQGaFK6Fj4N9pz9.
{{cite web}}
: Missing or empty|title=
(help)