Leek solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Leek solar farm is an operating solar photovoltaic (PV) farm in Leek, Westerkwartier Municipality, Groningen, Netherlands.
Project Details
Table 1: Phase-level project details for Leek solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Operating[1] | 2021[1] | 29 MWp/dc[1] | PV[2] | Blue Elephant Energy AG (BEE) [100%][1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Leek solar farm
Location | Coordinates (WGS 84) |
---|---|
Leek, Westerkwartier Municipality, Groningen, Netherlands[1][3] | 53.183, 6.362 (exact)[1][3] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240201212826/https://www.pv-magazine.com/press-releases/chint-solar-completes-solar-parks-in-the-netherlands/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240207095227/https://www.powerfield.nl/locatie/zonnepark-leek/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 https://en.wikipedia.org/wiki/Leek_Netherlands.
{{cite web}}
: Missing or empty|title=
(help)