Lelystad-Meeuwentocht wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Meeuwentocht BV

Lelystad-Meeuwentocht wind farm is an operating wind farm in Lelystad, Flevoland, Netherlands.

Project Details

Table 1: Phase-level project details for Lelystad-Meeuwentocht wind farm

Status Commissioning year Nameplate capacity Type Operator
Operating[1] 2003[2] 18 MW[3] Onshore Windplan Groen[1]

Location

Table 2: Phase-level location details for Lelystad-Meeuwentocht wind farm

Location Coordinates (WGS 84)
Lelystad, Flevoland, Netherlands[4] 52.4045, 5.5266 (exact)[4]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 (PDF) https://web.archive.org/web/20240126142112/http://tso2020.eu/wp-content/uploads/2019/12/05-06-2019-TSO2020-Task-2-Report-Final-version.pdf. Archived from the original (PDF) on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240126165448/http://meeuwentocht.nl/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. (PDF) https://web.archive.org/web/20240126023702/https://windharvest.com/wp-content/uploads/2020/08/Nethelands-Wind-Farms-with-15-and-20m-agl-wind-speeds-updated-8.25.20.pdf. Archived from the original (PDF) on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20240131225748/https://www.thewindpower.net/windfarm_en_1880_lelystad-meeuwentocht.php. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)