Levante Hydrogen Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Levante Hydrogen Pipeline is a proposed hydrogen pipeline between Greece and Italy.

Location

The pipeline is proposed to run offshore between Otranto, Italy and the Thesprotia region in Greece, along with an onshore section continuing East through Greece to Kipi, at the Greece/Turkey border.


Project details

  • Operator: IGI Poseidon S.A[1][2]
  • Owner: [1]
  • Parent company:
  • Capacity: 80GWh/d
  • Length: [3]
  • Diameter:
  • Status: Proposed[1]
  • Start year: 2028[1]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

The route from the project is derived from the H2inframap, which displays a collection of hydrogen-related projects across Europe.[1]


Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 "H2 Infrastructure Map Europe". www.h2inframap.eu. Retrieved 2024-08-15.
  2. "Other Initiatives - IGI Poseidon". igi-poseidon.com. Retrieved 2024-10-01.
  3. "TYNDP | ENTSOG". www.entsog.eu. Retrieved 2024-09-30.