Lianjiang power station (华电廉江电厂) is a cancelled power station in Cheban Town Longtousha, Lianjiang, Zhanjiang, Guangdong, China. It is also known as Huadian Lianjiang power station.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Lianjiang power station | Cheban Town Longtousha, Lianjiang, Zhanjiang, Guangdong, China | 21.45958, 109.811984 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 21.45958, 109.811984
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology |
---|---|---|---|---|
Unit 1 | cancelled | coal: unknown | 1000 | ultra-supercritical |
Unit 2 | cancelled | coal: unknown | 1000 | ultra-supercritical |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Huadian Zhanjiang Power Generation Co Ltd [100%] | Huadian Power International Co Ltd [65.0%]; Shenzhen Ruihong Investment Co Ltd [33.2%]; Shenzhen Nandian Energy Investment Co Ltd [1.8%] |
Unit 2 | Huadian Zhanjiang Power Generation Co Ltd [100%] | Huadian Power International Co Ltd [65.0%]; Shenzhen Ruihong Investment Co Ltd [33.2%]; Shenzhen Nandian Energy Investment Co Ltd [1.8%] |
Background on Project
China Huadian is seeking permitting for a 2 x 1,000 MW ultra-supercritical coal plant in Cheban Town, Longtousha.[1][2]
Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity
Due to new restrictions announced during 2016 by the National Energy Administration and the National Development and Reform Commission, further capacity expansions at this location appear to be on hold or cancelled. For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.
In July 2018, the Guangdong Provincial EPA said it would not permit any coal plants for construction in 2018.[3]
With no developments since 2015, the project appears to be cancelled.
Articles and Resources
References
- ↑ "华电湛江发电有限公司2016年大学生招聘启事," 北极星火电招聘网, 2016年03月25日
- ↑ "加快推进广东华电廉江电厂新建项目早日落地," 湛江日报, 2015-08-05