GFG Liberty Ostrava steel plant, also known as ArcelorMittal Ostrava a.s., is a basic oxygen furnace (BOF) steel plant operating in Ostrava-Kunčice, Moravia-Silesia, Czech Republic.
Location
The map below shows the exact location of the plant in Ostrava-Kunčice, Moravia-Silesia, Czech Republic:
- Location: Vratimovská 689/117, 719 00 Ostrava-Kunčice, Czech Republic
- Coordinates (WGS 84): 49.792139, 18.309875 (exact)
Background
Liberty Ostrava, previously owned by ArcelorMittal, was purchased by Liberty Steel in July 2019 along with six other steel plants including Liberty Galati.[1]
Transition
In November 2020, GFG Liberty announced plans to install two new hybrid furnaces at GFG Liberty Ostrava. The plan includes replacing the plant's existing four tandem furnaces with two hybrid furnaces by 2023. GFG Liberty reports that the new furnaces will reduce dust emissions by 60 percent. They also report that once the 400kV power line is installed by 2025, carbon emissions will be reduced by more than 50 percent as the furnaces will be able to use 70 percent scrap, reducing the plant's reliance on imported coal and iron.[2]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Construction date | Start date | Pre-retirement announcement date | Retired date | Workforce size |
---|---|---|---|---|---|---|---|
Main plant | Operating[3][4] | – | – | 1952[5] | – | – | 6000[6][7] |
Expansion | Construction[8][9] | 2020-11[9] | 2022-07[9] | 2025[8] | – | – | – |
Closure | Operating pre-retirement[8][9] | – | – | –[8] | 2020-11[9] | 2025[8] | – |
Main plant | Operating[3][4] | – | – | 1952[5] | – | – | 6000[6][7] |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|---|
Main plant | GFG Alliance Ltd [100.0%] | 5057811578 [100%] | E100001000556 [100%] | Liberty Steel[10] | 5001068852 | E100000130950 |
Table 3: Process and Products
Phase | Steel product category | Steel products | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|---|
Main plant | semi-finished; finished rolled[11][12] | billets; slabs; sections; wire rod; hot strip; tubes[11][12] | 2022[13] | 2022[13] | BF, BOF[14] | 3 coking plants; 5 sinter plants; 4 tandem BOF furnaces[15][16][17][18][18] |
Expansion | semi-finished; finished rolled[11][12] | billets; slabs; sections; wire rod; hot strip; tubes[11][12] | – | – | EAF[8] | 2 EAF (200-tonne each, Danieli hybrid QONE power EAF)[8][9] |
Closure | semi-finished; finished rolled[11][12] | billets; slabs; sections; wire rod; hot strip; tubes[11][12] | – | – | BOF[16] | 4 tandem BOF furnaces[15][16][17][18][18] |
Main plant | semi-finished; finished rolled[11][12] | billets; slabs; sections; wire rod; hot strip; tubes[11][12] | 2022[13] | 2022[13] | BF, BOF[14] | 3 coking plants; 5 sinter plants; 4 tandem BOF furnaces[15][16][17][18][18] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Basic oxygen furnace steelmaking capacity | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|---|
Main plant | operating | – | – | – |
Expansion | construction | – | 3500 TTPA[8][8] | 3500 TTPA[8][8] |
Closure | operating pre-retirement | 3600 TTPA[19][19][19][19] | – | 3600 TTPA[19][19][19][19] |
Main plant | retired | – | – | – |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | 2100 TTPA[20][20][21] | 2100 TTPA[20][20][21] |
Expansion | construction | – | – |
Closure | operating pre-retirement | – | – |
Main plant | retired | 1100 TTPA[20][20][21] | 1100 TTPA[20][20][21] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Phase | Sinter | Coke |
---|---|---|
Main plant | >0 TTPA[5] | 1200 TTPA[17] |
Expansion | – | – |
Closure | – | – |
Main plant | >0 TTPA[5] | 1200 TTPA[17] |
Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum)
Year | BOF Production | Total (all routes) |
---|---|---|
2020 | – | – |
2021 | 2280 TTPA[8] | 2280 TTPA |
2022 | 1713 TTPA[22][23] | 1713 TTPA |
Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum)
Year | BF Production | Total (all routes) |
---|---|---|
2020 | – | – |
2021 | 1930 TTPA[8] | 1930 TTPA |
2022 | – | – |
Blast Furnace Details
Table 9: Blast Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Furnace manufacturer and model | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|---|---|
2 | operating[24][4] | unknown | unknown | 1952[25] | – | 8 meters (hearth diameter)[26] | 1100[20] | unknown | unknown |
3 | operating[24][4] | unknown | unknown | 1961[27] | MORAVSKÉ MONTÁŽE (parts/repairs)[28] | 8 meters (hearth diameter)[26] | 1000[20] | unknown | unknown |
4 | retired[29][8] | unknown | unknown | 1961[27] | MORAVSKÉ MONTÁŽE (parts/repairs)[28] | 8 meters (hearth diameter)[26] | 1100[21] | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ Liberty takes over Romanian steel plant in Galati under global deal, Romania Insider, Jul. 2, 2019
- ↑ Liberty Steel to install two hybrid furnaces at Ostrava, Steel Orbis, Nov. 11, 2020
- ↑ 3.0 3.1 https://web.archive.org/web/20240223003847/https://agmetalminer.com/2024/01/24/steel-manufacturing-liberty-delay/. Archived from the original on 23 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 https://www.reuters.com/markets/commodities/czech-steelmaker-liberty-seeks-path-profitability-restart-plan-2023-12-19/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 https://web.archive.org/web/20220319202700/https://libertysteelgroup.com/cz/news/the-ostrava-mill-turns-70-years-old/?lang. Archived from the original on 19 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://web.archive.org/web/20211104151616/https://libertysteelgroup.com/cz/?lang. Archived from the original on 04 November 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20240119004323/https://www.steelguru.com/steel/czechia-liberty-ostravas-production-pause-persists. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 8.12 8.13 https://web.archive.org/web/20220722005356/https://www.spglobal.com/commodityinsights/en/market-insights/latest-news/metals/070822-liberty-steel-ostrava-to-install-hybrid-eafs-in-czech-republic-in-green-steel-push. Archived from the original on 22 July 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 9.4 9.5 https://web.archive.org/web/20221005193002/https://libertysteelgroup.com/cz/news/liberty-makes-historic-investment-in-ostravas-greensteel-transformation/?lang=en. Archived from the original on 05 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125060313/https://www.romania-insider.com/liberty-galati-steel-plant-acquisition. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 11.4 11.5 11.6 11.7 https://web.archive.org/web/20220319101417/https://libertysteelgroup.com/cz/about/operations/rolling-mills/?lang. Archived from the original on 19 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 12.3 12.4 12.5 12.6 12.7 https://web.archive.org/web/20220319202334/https://libertysteelgroup.com/cz/about/operations/?lang. Archived from the original on 19 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 13.3 https://web.archive.org/web/20240122223831/https://libertysteelgroup.com/cz/products/certification-ims-liberty-ostrava-a-s/?lang=en. Archived from the original on 22 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 https://web.archive.org/web/20240122224332/https://libertysteelgroup.com/delivering_cn30/. Archived from the original on 22 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 15.2 https://web.archive.org/web/20210303080637/https://eurometal.net/liberty-commits-to-220-million-galati-investment/. Archived from the original on 03 March 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 16.0 16.1 16.2 16.3 (PDF) https://web.archive.org/web/20220127003611/https://www.libertyostrava.cz/pdf/LIB0053-Project-Delta-Brochure-ENGLISH_E.pdf. Archived from the original (PDF) on 27 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 17.2 17.3 17.4 https://web.archive.org/web/20220318083721/https://libertysteelgroup.com/cz/about/operations/coke-oven-plant/?lang. Archived from the original on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 18.0 18.1 18.2 18.3 18.4 18.5 https://web.archive.org/web/20220127210027/https://libertysteelgroup.com/cz/about/operations/steel-plant/?lang=en. Archived from the original on 27 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 19.2 19.3 19.4 19.5 19.6 19.7 https://web.archive.org/web/20220716032834/https://libertysteelgroup.com/cz/. Archived from the original on 16 July 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 20.0 20.1 20.2 20.3 20.4 20.5 20.6 20.7 20.8 20.9 https://www.argusmedia.com/en/news/2096805-czech-liberty-ostrava-idles-blast-furnace-2.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 21.0 21.1 21.2 21.3 21.4 (PDF) https://web.archive.org/web/20220318115528/https://www.eurofer.eu/assets/Uploads/Map-20191113_Eurofer_SteelIndustry_Rev3-has-stainless.pdf. Archived from the original (PDF) on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240302055359/http://libertysteelgroup.com/wp-content/uploads/2023/11/Liberty-Steel-Sustainability-Report-2023.pdf. Archived from the original (PDF) on 02 March 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240302055433/https://worldsteel.org/publications/bookshop/world-steel-in-figures-2023/. Archived from the original on 02 March 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 24.0 24.1 https://uk.marketscreener.com/quote/stock/ARCELORMITTAL-34942237/news/Liberty-Ostrava-s-Czech-steel-workers-remain-at-home-amid-energy-supply-feud-45690825/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://metalscraps.co.uk/news-british-liberty-steel-returns-a-blast-furnace-to-the-czech-republic-21.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 26.0 26.1 26.2 (PDF) http://www.envicomab.com/wp-content/uploads/2014/08/Lungmuss-Taphole-Clay-Brochure-Blast-Furnaces.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 27.0 27.1 https://web.archive.org/web/20220820020930/https://www.viktormacha.com/galerie/liberty-steel-nova-hut-ostrava-115/. Archived from the original on 20 August 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 28.0 28.1 https://web.archive.org/web/20210423133317/https://www.mmo-sro.cz/en/reference/year-1995-2010/. Archived from the original on 23 April 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221012195430/https://libertysteelgroup.com/cz/news/liberty-ostrava-to-temporarily-idle-blast-furnace-no-2-for-repairs/?lang=en. Archived from the original on 12 October 2022.
{{cite web}}
: Missing or empty|title=
(help)