Lijiaqu Coal Mine
From Global Energy Monitor
This article is part of the CoalSwarm coverage of China and coal |
Sub-articles: |
"'Lijiaqu coal mine'" (准格尔旗川掌李家渠煤炭有限责任公司) The construction site is located in Narisong Town, Zhungeer Banner, Ordos City, Inner Mongolia, and its designed production capacity is 1.2 million tonnes per year.[1]
Location
The undated satellite photo below shows the coal mine located in Narisong Town, Zhungeer Banner, Ordos City, Inner Mongolia, China.
Coal Mine Background
According to the investigation by the Zhungeer government in the first quarter of 2020, the coal mine has begun sales.[2] However, the specific date of production has not yet been known. On October 7, 2021, the mine's capacity was expanded to 2.4 million tons per year.[3]
Project Details
- Sponsor: Zhungeer Qichuanzhang Lijiaqu Coal Co., Ltd[1]
- Parent Company: Zhungeer Banner Chuanzhang Lijiaqu Coal Co., Ltd.[4]
- Location: Narisong Town, Zhungeer Banner, Ordos City, Inner Mongolia, China.[4]
- GPS Coordinates: 39.475602,110.520839(approximate)
- Status: Operating[2]
- Production Capacity: 2.4Mt/year[3]
- Workforce Size:less than 50[4]
- Coal Field:Dongsheng Coalfield[5]
- Total Resource:
- Mineable Reserves:10.7829Mt[6]
- Coal Type: Non-caking coal (Thermal)[5]
- Mine Size: 2.0572k㎡[5]
- Mine Type: Surface [1]
- Start Year:
- Source of Financing:
Articles and resources
References
- ↑ 1.0 1.1 1.2 "对准格尔旗川掌李家渠煤炭有限责任公司李家渠煤矿生产能力等生产要素信息的公告",内蒙古自治区工业和信息化厅,检索日期:2020/10/27
- ↑ 2.0 2.1 "2020年第一季度双随机",准格尔人民政府,检索日期:2020/10/27
- ↑ 3.0 3.1 "增产9835万吨!内蒙紧急释放72处煤矿产能!"国际能源网, 2021/10/09
- ↑ 4.0 4.1 4.2 "准格尔旗川掌李家渠煤炭有限责任公司",企查查,检索日期:2020/10/27
- ↑ 5.0 5.1 5.2 "内蒙古自治区东胜煤田勃牛川普查区李家渠煤矿煤炭生产勘探报告"内蒙古龙旺地质勘探有限责任公司,2010-01-01
- ↑ "准格尔旗川掌李家渠煤炭有限责任公司李家渠煤矿危险废物暂存库建设项目环境影响报告表",准格尔旗川掌李家渠煤炭有限责任公司,2021/01