Lincoln Gap wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Lincoln Gap wind farm is an operating wind farm in Pastoral Unincorporated Area, South Australia, Australia.
Project Details
Table 1: Phase-level project details for Lincoln Gap wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2020[1] | 126 MW[2] | Onshore[3] | Nexif Energy [100%][1] | Nexif Energy[1] |
2 | Operating[4] | 2022[4] | 86 MW[5] | Onshore[6] | Nexif Energy [100%][1] | Nexif Energy[7] |
3 | Pre-construction[8] | 2024 (planned)[8] | 256 MW[4] | Onshore[4] | Nexif Energy [100%][1] | – |
Location
Table 2: Phase-level location details for Lincoln Gap wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Pastoral Unincorporated Area, South Australia, Australia[2] | -32.5432, 137.5508 (exact)[2] |
2 | Pastoral Unincorporated Area, South Australia, Australia[2] | -32.5432, 137.5508 (exact)[2] |
3 | South Australia, Australia[9] | -32.588, 137.5552 (exact)[9] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 (PDF) https://web.archive.org/web/20240125152627/https://www.ecogeneration.com.au/wp-content/uploads/2021/01/WindMap-202102.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240126064627/https://www.thewindpower.net/windfarm_en_26720.php. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126112433/https://opennem.org.au/facilities/au/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20240126064522/https://lincolngapwindfarm.com.au/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126064529/https://www.thewindpower.net/windfarm_en_27446.php. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126113115/https://opennem.org.au/facility/au/NEM/LGAPWF1/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131082524/http://lincolngapwindfarm.com.au/about-the-project/. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20240126152413/https://www.energymining.sa.gov.au/home/news/archive/articles/2022/thinking-critical-south-australia-lures-thought-leaders-to-our-state/interconnector-puts-wind-in-the-sails-of-lincoln-gap. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 (PDF) https://web.archive.org/web/20240201031224/https://www.dit.sa.gov.au/__data/assets/pdf_file/0003/741531/Agenda_Item_3.2.1_-_DA_010-V070-19_Web.pdf. Archived from the original (PDF) on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)