Lixin Banji power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Lixin Banji power station (中煤新集电力安徽利辛板集电厂) is an operating power station of at least 2000-megawatts (MW) in Banji, Lixin, Bozhou, Anhui, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Lixin Banji power station | Banji, Lixin, Bozhou, Anhui, China | 32.897245, 116.242561 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 32.897245, 116.242561
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase I Unit 1 | operating | coal: unknown | 1000 | ultra-supercritical | 2016 |
Phase I Unit 2 | operating | coal: unknown | 1000 | ultra-supercritical | 2016 |
Phase II Unit 3 | construction | coal: unknown | 660 | ultra-supercritical | 2024 (planned) |
Phase II Unit 4 | construction | coal: unknown | 660 | ultra-supercritical | 2024 (planned) |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | China Coal Xinji Lixin Power Generation Co Ltd [100%] | China Coal Xinji Energy Co Ltd [55.0%]; An Hui Wenergy Co Ltd [45.0%] |
Phase I Unit 2 | China Coal Xinji Lixin Power Generation Co Ltd [100%] | China Coal Xinji Energy Co Ltd [55.0%]; An Hui Wenergy Co Ltd [45.0%] |
Phase II Unit 3 | China Coal Xinji Lixin Power Generation Co Ltd [100%] | China Coal Xinji Energy Co Ltd [55.0%]; An Hui Wenergy Co Ltd [45.0%] |
Phase II Unit 4 | China Coal Xinji Lixin Power Generation Co Ltd [100%] | China Coal Xinji Energy Co Ltd [55.0%]; An Hui Wenergy Co Ltd [45.0%] |
Background on Project
SDIC is sponsor of a two-unit coal-fired power plant of 2,000 MW in Anhui Province. In November 2013, SDIC signed a construction contract with Shandong Electric Power Engineering Consulting Institute Corp., with construction slated to begin in 2014 and be completed in 2016.[1]
Environmental permits were issued in March 2014.[2]
The power station went online in 2016.[3][4]
Expansion
In March 2020, two additional 1,000 MW units at the power station (Units 3-4) were listed as a priority project for Anhui province, as part of a UHV power hub in the Yangtze River Delta.[5]
In January 2021, two new 660 MW units at the power station were permitted for construction.[6][7]
As of May 2021, construction was expected to begin by early 2022.[8] It began in September 2022.[9]
Ownership
The parent company changed from SDIC to China Coal and Wenergy Group in December 2016.[10]
Articles and Resources
References
- ↑ SDEPCI signed EPC contract for SDIC Banji 2×1000MW units project, SDEPCI press release, accessed Nov. 2014.
- ↑ "关于安徽利辛板集电厂(2×1000MW)新建工程环境影响报告书的批复,", 中华人民共和国环境保护部 , 2014-03-13.
- ↑ "国投新集电力利辛板集电厂#1机一次顺利通过168小时试运行," SDIC, 2016-08-24
- ↑ "安徽省环保厅关于拟作出安徽利辛板集电厂(2×1000MW)新建工程脱硫、脱硝、除尘设施竣工环境保护验收意见的公开," Anhui DEP, 2017-1-4
- ↑ "全文|安徽省实施长江三角洲区域一体化发展规划纲要行动计划," 安徽省人民政府, 2020/3/13
- ↑ "2×660MW!中煤新集利辛板集电厂二期项目核准前公示 - 北极星火力发电网". news.bjx.com.cn. 2021-01-14. Retrieved 2021-01-05.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2×660MW!中煤新集利辛板集电厂二期项目获得核准批复, BJX, 2021-02-01
- ↑ "新集能源:中煤新集利辛板集电厂二期项目计划2021年底或2022年初开工建设," ifeng, May 17, 2021
- ↑ 2×660MW!安徽板集电厂二期项目开工, BJX, 2022-09-30
- ↑ "新集能源:央企改革初见成效,未来将积极推动煤电一体化," China Finance, 2017-06-22
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.