Long An BCG-CME solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Long An BCG-CME 2 GAIA solar farm (Phase 2), Long An Solar Pv (Phase 1), GAIA solar farm (Phase 2)
Long An BCG-CME solar farm is an operating solar photovoltaic (PV) farm in Thạnh Hóa, Long An, Vietnam.
Project Details
Table 1: Phase-level project details for Long An BCG-CME solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Operating[1] | 2019[1] | 41 MWp/dc[1] | PV[1] | Bamboo Capital JSC [100%][2] |
2 | Operating[3] | 2020[3] | 126 MWp/dc[4] | PV | Hanwha – Bamboo Capital Group Bang Duong Energy JSC [100%][5] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Long An BCG-CME solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Thạnh Hóa, Long An, Vietnam[1] | 10.9287, 106.8773 (approximate)[1] |
2 | Thạnh Hóa, Long An, Vietnam[4] | 10.9287, 106.8773 (approximate)[4] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20211215200323/https://bamboocap.com.vn/en-US/our-investments/renewable-energy/bcg-cme-long-an-1-1. Archived from the original on 15 December 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240207161620/https://bamboocap.com.vn/en-US/media/news/2021-news/thang-4-1/grand-opening-of-phu-my-solar-power-plant. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240207161122/https://bamboocap.com.vn/en-US/our-investments/renewable-energy/bcg-cme-long-an-2-1. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 (PDF) https://web.archive.org/web/20240201145413/https://pdf.usaid.gov/pdf_docs/PA00XH11.pdf. Archived from the original (PDF) on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211216165213/https://pcc1.vn/en/pcc1-signed-engineering-procurement-and-construction-epc-contract-of-110kw-substation-and-connecting-line-of-gaia-100-5-mwp-solar-power-plant-project/. Archived from the original on 16 December 2021.
{{cite web}}
: Missing or empty|title=
(help)