Los Camarones Solar Project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Los Camarones Solar Project (Proyecto termosolar Los Camarones) is a cancelled solar thermal farm in Arica, Chile.

Project Details

Table 1: Phase-level project details for Los Camarones Solar Project

Status Nameplate capacity Technology Operator
Cancelled[1] 105 MWac[1] Solar Thermal[1] Elecnor SA[1]

Location

Table 2: Phase-level location details for Los Camarones Solar Project

Location Coordinates (WGS 84)
Arica, Chile[1] -53.1502, -70.9174 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240201162346/https://www.protermosolar.com/proyecto-termosolar-de-elecnor-en-chile/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)