Lucky Cement solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Pezu solar farm, Karachi solar farm

Lucky Cement solar farm is an operating solar farm in Lakki Marwat District, Bannu Division, Khyber Pakhtunkhwa, Pakistan.

Project Details

Table 1: Phase-level project details for Lucky Cement solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner
1 Operating[1] 2022[1] 34 MW[2] Assumed PV[1] Lucky Cement LTD[3]
2 Operating[1] 2023[1] 25 MW[1] Assumed PV[1] Lucky Cement LTD[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Lucky Cement solar farm

Phase Name Location Coordinates (WGS 84)
1 Lakki Marwat District, Bannu Division, Khyber Pakhtunkhwa, Pakistan[4] 32.2910, 70.7378 (approximate)[4]
2 Malir District, Sindh, Pakistan[5][1] 25.0557, 67.4998 (approximate)[5][1]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 https://tribune.com.pk/story/2431856/lucky-sets-up-2nd-solar-plant-to-slash-costs. {{cite web}}: Missing or empty |title= (help)
  2. (PDF) https://www.lucky-cement.com/wp-content/uploads/2023/01/Analyst_Briefing_-_HY_23_-_Final.pdf. {{cite web}}: Missing or empty |title= (help)
  3. https://www.brecorder.com/news/40217528. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://goo.gl/maps/Hs33ZP1a5z1D9Ugg6. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://goo.gl/maps/s6JW13YgXng2NeyV7. {{cite web}}: Missing or empty |title= (help)