Lufira River hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Lufira River hydroelectric plant is a cancelled hydroelectric power plant in Mutshatsha, Lualaba, DR Congo.
Project Details
Table 1: Project details for Lufira River hydroelectric plant
Status | Nameplate capacity | Owner |
---|---|---|
Cancelled[1] | 150 MW[2] | Power Construction Corporation of China (PowerChina) [51%]; Kipay Investments [49%][3] |
Location
Table 2: Location details for Lufira River hydroelectric plant
Location | Coordinates (WGS 84) |
---|---|
Mutshatsha, Mutshatsha, Lualaba, Lualaba, DR Congo[3] | -11.6329, 25.6195 (approximate)[3] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 4 years no published updates
- ↑ https://web.archive.org/web/20221005153206/https://www.afrik21.africa/en/drc-two-hydroelectric-dams-of-1050-mw-to-be-built-by-power-china/. Archived from the original on 05 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20220914180806/https://nai500.com/blog/2019/06/powerchina-to-build-two-hydro-power-plants-in-congo-partners-say/. Archived from the original on 14 September 2022.
{{cite web}}
: Missing or empty|title=
(help)