Lumina Solar Project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Lumina Solar Project is an operating solar photovoltaic (PV) farm in Scurry County, Texas, United States.

Project Details

Table 1: Phase-level project details for Lumina Solar Project

Phase name Status Commissioning year Nameplate capacity Technology Owner
1 Operating[1] 2024[2] 327 MWac[3] PV[3] Intersect Power [100%][4]
2 Operating[1] 2024[2] 327 MWac[3] PV[3] Intersect Power [100%][4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Lumina Solar Project

Phase Name Location Coordinates (WGS 84)
1 Scurry County, Texas, United States[3] 32.9011, -100.9827 (exact)[3]
2 Scurry County, Texas, United States[3] 32.8835, -100.7464 (exact)[3]

The map below shows the exact locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://www.energyglobal.com/solar/12012024/intersect-powers-828-mwp-lumina-solar-project-reaches-commercial-operation/ https://www.eia.gov/electricity/data/eia860m/, https://www.energyglobal.com/solar/12012024/intersect-powers-828-mwp-lumina-solar-project-reaches-commercial-operation/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00. {{cite web}}: Check date values in: |access-date= (help)
  4. 4.0 4.1 https://www.energyglobal.com/solar/12012024/intersect-powers-828-mwp-lumina-solar-project-reaches-commercial-operation/. {{cite web}}: Missing or empty |title= (help)