Lumivaara 2 wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Lumivaara 2 wind farm is a wind farm in pre-construction in Hyrynsalmi, Kainuu, Finland.
Project Details
Table 1: Phase-level project details for Lumivaara 2 wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner |
---|---|---|---|---|
Pre-construction[1] | 2025 (planned)[1] | 53 MW[1] | Onshore[2] | Neoen [80%]; Prokon [20%][1] |
Location
Table 2: Phase-level location details for Lumivaara 2 wind farm
Location | Coordinates (WGS 84) |
---|---|
Hyrynsalmi, Kainuu, Finland[1] | 64.6829, 28.4841 (approximate)[3] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://tuulivoimayhdistys.fi/en/wind-power-in-finland/projects-under-construction.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://neoen.com/fi/uutiset/2022/neoen-ja-prokon-allekirjoittivat-toisen-sahkonostosopimuksen-equinixin-kanssa-vahintaan-42-mwn-tuulienergiasta-suomessa/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.prokonfinland.fi/en/our-projects/haukineva.
{{cite web}}
: Missing or empty|title=
(help)