Luneng Baoqing Dahezhen power station

From Global Energy Monitor

Luneng Baoqing Dahezhen power station (鲁能宝清朝阳发电厂) is a proposed 4,000-megawatt (MW) coal-fired power plant in Heilongjiang Province, China.

Location

The map below shows the location of Baoqing County, the approximate location where the plant would be built in Shuangyashan Prefecture, Heilongjiang Province.

Loading map...


Background on Project

SGCC's Luneng Group is was planning to build a coal-fired power plant with a total planned capacity of 4,000 MW in Heilongjiang Province.[1]

In 2010 Luneng Group transferred its coal possessions, including coal power plants, to Guodian (State Grid). In 2012 Guodian transferred the coal assets to Shenhua Group Corporation.[2]

As of 2014 it appears the only power station Shenhua Group is pursuing is the 1200 MW Luneng Baoqing power station in Baoqing County.[3][4]

Project Details

  • Sponsor: Shenhua Group
  • Parent company:
  • Location: Baoqing County, Shuangyashan Prefecture, Heilongjiang Province, China
  • Coordinates: 46.327, 132.197 (approximate)
  • Status: Cancelled
  • Gross capacity: 4,000 MW
  • Type:
  • Projected in service:
  • Coal type:
  • Coal source:
  • Source of financing:

Articles and resources

References

  1. Ailun Yang and Yiyun Cui, "Global Coal Risk Assessment: Data Analysis and Market Research," World Resources Institute working paper, November 2012
  2. "国网660亿煤电资产腾挪 神华接手," sina.com.cn, 2012/08/17
  3. "宝清县2014年政府工作报告," hlbaoqing.gov.cn, 2014-1-17
  4. "国家节能中心评审神华国能宝清发电厂新建工程," China ECC, 2014-07-29