Młoty hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Młoty hydroelectric plant is a hydroelectric power plant under construction in Kłodzko County, Lower Silesian Voivodeship, Poland.
Project Details
Table 1: Project details for Młoty hydroelectric plant
Status | Commissioning year | Nameplate capacity | Technology type | Owner |
---|---|---|---|---|
Construction[1] | 2030 (planned)[2] | 750 MW[1] | Pumped storage[1] | PGE Energia Odnawialna SA[1] |
Location
Table 2: Location details for Młoty hydroelectric plant
Location | Coordinates (WGS 84) |
---|---|
Kłodzko County, Lower Silesian Voivodeship, Poland[3][1] | 50.2981, 16.5506 (exact)[1][3] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20221118161215/https://notesfrompoland.com/2022/01/18/poland-set-to-resume-work-on-largest-hydroelectric-plant-after-33-years/. Archived from the original on 18 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230110100139/https://renewablesnow.com/news/pge-eco-fund-to-partner-for-750-mw-pumped-storage-plant-in-poland-810776/. Archived from the original on 10 January 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20220915174409/https://www.google.com/maps/place/Elektrownia+Szczytowo+Pompowa/@50.297974,16.5481592,314m/data=!3m1!1e3!4m6!3m5!1s0x470e0f4c33e1063b:0x2d75782b72d554e4!8m2!3d50.2981093!4d16.5506009!15sCiVTemN6eXRvd28gUG9tcG93YSBQb3dlciBQbGFudCwgTcWCb3R5kgELcG93ZXJfcGxhbnQ?shorturl=1. Archived from the original on 15 September 2022.
{{cite web}}
: Missing or empty|title=
(help)