MMK Türkiye Metallurgical Payas plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

MMK Türkiye Metallurgical Payas plant (MMK METALURJİ SAN.TİC. ve LİMAN İŞLT. A.Ş.), also known as MMK Metalurgi, is a steel plant in Payas, Hatay, Türkiye that operates electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Payas, Hatay, Türkiye:

Loading map...
  • Location: Özerli mah. Alparslan Türkeş Bulvarı. No.346/91 31600 Dörtyol, Payas, Hatay, Türkiye
  • Coordinates (WGS 84): 36.768975, 36.213842 (exact)

Background

MMK Turkey was established in 2007 and the steel making plant started in 2011.[1]

Port

MMK Turkey operates a port in Dilovasi, Kocaeli, Turkey with a capacity of 12 MTPA.[2]

Plant Details

Table 1: General Plant Details

Construction date Start date Workforce size Power source Iron ore source Coal source
2008[3] 2011[4] 1219[4] unknown unknown unknown

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Magnitogorskiy Metallurgicheskiy Kombinat PJSC [100.0%] 4295887044 [100.0%] E100000002080 [100.0%] MMK Metalurji Sanayi Ticaret ve Liman Isletmeciligi AŞ [100%][4] 5037247780 E100001010269 [100%]

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Responsible steel Main production equipment
semi-finished, finished rolled[4] galvanized, sheet, coated, cold rolled, coil[4] unknown 2024-05-20[5] 2024-05-20[5] unknown EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 2500[6][7][8][9] 2500[6][7][8][9]

Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year EAF production Other/unknown steel production
2019 unknown unknown
2020 unknown unknown
2021 unknown unknown
2022 unknown unknown
2023 unknown unknown

Unit Details

Table 6: Electric Arc Furnace Details

Unit name Status Announced date Furnace manufacturer and model Current capacity (ttpa)
unknown EAF (1) operating[10] 2007[11] Danieli[12] 2500[7][9][6][8]

Table 7: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % pig iron (unknown if basic/merchant or granulated
unknown EAF (1) yes[13] 75.00[14] 25.00[14]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "MMK METALURJİ SAN.TİC. ve LİMAN İŞLT. A.Ş." Archived from the original on January 12, 2022. Retrieved January 19, 2022.
  2. Main Page, MMK Turkey, Retrieved on: Jul. 28, 2020
  3. https://en.wikipedia.org/wiki/MMK-Ataka%C5%9F_Metallurgy. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20220112165728/https://celik.org.tr/en/mmk-metalurji-san-tic-ve-liman-islt-a-s/. Archived from the original on 2022-01-12. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://mmkturkey.com.tr/management-system-certificates-. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 https://web.archive.org/web/20220727123716/https://www.steelorbis.com/steel-news/latest-news/mmk-atakas-becomes-mmk-metalurji-627790.htm. Archived from the original on 2022-07-27. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 https://web.archive.org/web/20220813063108/https://www.steeltimesint.com/news/mmk-launches-electric-steelmaking-shop-in-turkey. Archived from the original on 2022-08-13. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 https://www.steelorbis.com/steel-news/latest-news/mmk-continues-investments-at-full-speed-1226152.htm. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 https://web.archive.org/web/20160304041152/http://www.haberaktuel.com/hatayda-dev-celik-yatiriminin-temeli-atildi-haberi-117439.html. Archived from the original on 2016-03-04. {{cite web}}: Missing or empty |title= (help)
  10. https://web.archive.org/web/20240906184901/https://www.steelradar.com/en/haber/mmk-metalurji-will-start-production-again/. Archived from the original on 2024-09-06. {{cite web}}: Missing or empty |title= (help)
  11. https://www.aist.org/mmk-atakas-commissions-eaf-facility. {{cite web}}: Missing or empty |title= (help)
  12. https://tr.steelorbis.com/celik-haberleri/guncel-haberler/mmk-atakas-ekipman-anlasmasini-danieliyle-yapti-417725.htm. {{cite web}}: Missing or empty |title= (help)
  13. https://web.archive.org/web/20240809191715/https://mmkturkey.com.tr/hot-rolled-products-hr. Archived from the original on 2024-08-09. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 http://vestnik.magtu.ru/en/27-archive/no-1-45-march-2014/97-bigeev-v-a-valiakhmedov-a-kh-yener-burak-fedyanin-a-n-steel-smelting-experience-in-the-superpower-arc-furnace-with-firm-cast-iron-raised-consumption.html. {{cite web}}: Missing or empty |title= (help)

Resources