Macagua 2 hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Other names: Antonio Jose de Sucre 2
Macagua 2 hydroelectric plant (Central Hidroeléctrica Macagua 2) is an operating hydroelectric power plant in San Félix, Municipio Caroní, Bolivar State, Venezuela.
Project Details
Table 1: Project details for Macagua 2 hydroelectric plant
Status | Commissioning year | Nameplate capacity | Technology type | Owner |
---|---|---|---|---|
Operating[1] | 1996[1] | 2850 MW[1] | Conventional storage[1] | Corporación Eléctrica Nacional SA [100%][2] |
Location
Table 2: Location details for Macagua 2 hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
San Félix, Municipio Caroní, Bolivar State, Venezuela[3] | Río Caroní[4] | 8.3039, -62.6677 (exact)[3] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20220701174748/https://www.atkn.com/our-work/macagua-ii-hydroelectric-project. Archived from the original on 2022-07-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230120005251/https://borgenproject.org/tag/corpoelec/. Archived from the original on 2023-01-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240125091319/https://datasets.wri.org/dataset/globalpowerplantdatabase. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220401073322/https://www.caracaschronicles.com/2019/04/04/the-rise-and-fall-of-venezuelas-hydro-system/. Archived from the original on 2022-04-01.
{{cite web}}
: Missing or empty|title=
(help)