Madrakah–Al Hawiyah Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Madrakah–Al Hawiyah Gas Pipeline,خط أنابيب التدفق الحر, Known as Haradh–Hawiyah, is a gas pipeline under construction in Saudi Arabia.[1][2]

Location

The pipeline runs from Madrakah to Hawiyah, Saudi Arabia.[1]

Loading map...

Project details

  • Operator:
  • Owner: Saudi Aramco[1]
  • Parent company: Saudi Aramco[1]
  • Capacity: 290 MMcf/d[1]
  • Length: 450km[3]
  • Diameter:
  • Status: Construction[1][2]
  • Start year: 2023[4]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

The pipeline was built to transfer associated petroleum gas from Madrakah to Hawiyah, Saudi Arabia.

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "https://english.mubasher.info/news/3219495/Aramco-builds-pipeline-to-transfer-gas-to-Al-Hawiyah/". Retrieved 2022-09-16. {{cite web}}: External link in |title= (help)CS1 maint: url-status (link)
  2. 2.0 2.1 "مشاريع ضغط الغاز تدشِّن مشروع خط أنابيب التدفق الحر". www.aramco.com (in العربية). Retrieved 2022-09-16.
  3. أرقام. ""أرامكو السعودية" تبرم اتفاقيات مع شركات لخدمات الزيت والغاز بإجمالي 4.5 مليار دولار". أرقام (in العربية). Retrieved 2023-09-01.
  4. https://www.offshore-technology.com/data-insights/haradh-hawiyah-gas-gas-pipeline-saudi-arabia/. {{cite web}}: Missing or empty |title= (help)CS1 maint: url-status (link)