Mahinerangi wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Mahinerangi wind farm is an operating wind farm in Clutha District, Otago, New Zealand.
Project Details
Table 1: Phase-level project details for Mahinerangi wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2011[1] | 36 MW[1] | Onshore[2] | Mercury Energy [100%][3] | Mercury Energy[4] |
2 | Announced[4] | – | 160 MW[5] | Onshore[5] | Mercury Energy [100%][5] | Mercury Energy[4] |
Location
Table 2: Phase-level location details for Mahinerangi wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Clutha District, Otago, New Zealand[2] | -45.7619, 169.9197 (exact)[2] |
2 | Clutha District, Otago, New Zealand[2] | -45.7619, 169.9197 (exact)[2] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20210617035115/https://www.tiltrenewables.com/assets-and-projects/Mahinerangi-Wind-Farm-Stage1/. Archived from the original on 17 June 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240126113810/https://www.windenergy.org.nz/mahinerangi-wind-farm. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131170928/https://www.mercury.co.nz/about-us/renewable-energy/wind-generation/mahinerangi-wind-farm. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20240126153119/https://www.datacenterdynamics.com/en/news/aws-signs-wind-ppa-in-new-zealand/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20210617041512/https://www.tiltrenewables.com/assets-and-projects/Mahinerangi-Wind-Farm-Stage2/. Archived from the original on 17 June 2021.
{{cite web}}
: Missing or empty|title=
(help)