Mainit Wind Power Project

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Mainit Wind Power Project is a wind farm in pre-construction in Mainit, Surigao del Norte, Philippines.

Project Details

Table 1: Phase-level project details for Mainit Wind Power Project

Status Commissioning year Nameplate capacity Type Owner
Pre-construction[1] 2029 (planned)[2] 100 MW[3] Onshore[3] First Gen Visayas Energy Inc[2]

Location

Table 2: Phase-level location details for Mainit Wind Power Project

Location Coordinates (WGS 84)
Mainit, Surigao del Norte, Philippines[4] 9.5631, 125.5010 (approximate)[4]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. (PDF) https://doe.gov.ph/sites/default/files/pdf/renewable_energy/Awarded_Wind_Power_Projects_as_of_Feb_2024.pdf https://www.doe.gov.ph/sites/default/files/pdf/electric_power/annex-a-coe-to-ngcp-01-jan-may-2023_clearance-to-undertake-sis.PDF, https://doe.gov.ph/sites/default/files/pdf/renewable_energy/Awarded_Wind_Power_Projects_as_of_Feb_2024.pdf. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://doe.gov.ph/sites/default/files/pdf/electric_power/07_Mindanao_Indicative_30_apr_2024.pdf. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 (PDF) https://web.archive.org/web/20240125191811/https://www.doe.gov.ph/sites/default/files/pdf/electric_power/annex-a-coe-to-ngcp-01-jan-may-2023_clearance-to-undertake-sis.PDF. Archived from the original (PDF) on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 (PDF) https://doe.gov.ph/sites/default/files/pdf/electric_power/07_Mindanao_Indicative_30_apr_2024.pdf https://www.doe.gov.ph/sites/default/files/pdf/electric_power/annex-a-coe-to-ngcp-01-jan-may-2023_clearance-to-undertake-sis.PDF, https://doe.gov.ph/sites/default/files/pdf/electric_power/07_Mindanao_Indicative_30_apr_2024.pdf. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)