Maira Beta solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Agrupación Maira Beta

Maira Beta solar farm (Planta solar fotovoltaica Agrupación Maira Beta) is a solar photovoltaic (PV) farm in pre-construction in La Vid de Bureba, Burgos, Castilla y León, Spain.

Project Details

Table 1: Phase-level project details for Maira Beta solar farm

Status Nameplate capacity Technology Owner Operator
Pre-construction[1][2][3][4] 140.1 MWac[1] PV[1] Solaria Promoción y Desarrollo Fotovoltaico SL [100%][1] Solaria Energía y Medio Ambiente SA[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Maira Beta solar farm

Location Coordinates (WGS 84)
La Vid de Bureba, Burgos, Castilla y León, Spain[1] 42.646904, -3.301572 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-10545. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240201220823/https://www.energiaestrategica.com/fervor-solar-en-espana-solo-los-proyectos-presentados-este-ano-duplicarian-a-toda-potencia-la-instalada/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. https://www.noticiasdealava.eus/alava/2023/06/20/entorno-garona-tendra-seis-plantas-6952165.html. {{cite web}}: Missing or empty |title= (help)
  4. https://www.boe.es/diario_boe/txt.php?id=BOE-A-2022-22103. {{cite web}}: Missing or empty |title= (help)