Maira Gamma solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Agrupación Maira Gamma
Maira Gamma solar farm (Planta solar fotovoltaica Agrupación Maira Gamma) is a solar photovoltaic (PV) farm in pre-construction in Briviesca, Burgos, Castilla y León, Spain.
Project Details
Table 1: Phase-level project details for Maira Gamma solar farm
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Pre-construction[1][2][3][4] | 140.1 MWac[2] | PV[2] | Solaria Promoción y Desarrollo Fotovoltaico SL [100%][2] | Solaria Energía y Medio Ambiente SA[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Maira Gamma solar farm
Location | Coordinates (WGS 84) |
---|---|
Briviesca, Burgos, Castilla y León, Spain[2] | 42.543034, -3.338482 (approximate)[2] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240201220823/https://www.energiaestrategica.com/fervor-solar-en-espana-solo-los-proyectos-presentados-este-ano-duplicarian-a-toda-potencia-la-instalada/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-11175.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2022-22103.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.noticiasdealava.eus/alava/2023/06/20/entorno-garona-tendra-seis-plantas-6952165.html.
{{cite web}}
: Missing or empty|title=
(help)