Maling-Hui'anpu-Zhongning Oil Pipeline 马惠宁输油管道 (马岭-惠安堡-中宁) is an operating oil pipeline in China.[1]
Location
The pipeline runs from Maling, Quzi Town, Huan County, Qingyang, Gansu, through Hui'anpu town in Yanchi County, Wuzhong, Ningxia to Shikong Town, Zhongning, Zhongwei, Ningxia, China. [2][3]
Project details
Mainline
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.82010863801705,"lon":107.05427241771064,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.29917506691032,"lon":107.51827129900144},{"lat":36.38103420068778,"lon":107.47707257183987},{"lat":36.56876284015671,"lon":107.32326399043667},{"lat":36.747233651030825,"lon":107.18593489989814},{"lat":36.940658492653085,"lon":107.04585922754879},{"lat":37.148919632113056,"lon":106.7959202827686},{"lat":37.45260758520414,"lon":106.67232410128389}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator:
- Owner: 国家管网集团北方管道有限责任公司
- Parent company: PipeChina
- Capacity: 4.8 mtpa
- Length: 270 kilometers
- Diameter:
- Status: Operating
- Start year: 1979, 2016
Maling–Hui'anpu Oil Pipeline 马惠输油管道 (马岭-惠安堡)
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":36.8,"lon":106.9,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":36.229736,"lon":107.617034},{"lat":36.784275,"lon":107.167293},{"lat":37.43921,"lon":106.66564}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator:
- Owner: 国家管网集团北方管道有限责任公司
- Parent company:
- Capacity:
- Length:
- Diameter:
- Status: Retired (2015)
- Start year: 1979
- Cost:
- Financing:
- Associated infrastructure:
Hui'anpu–Zhongning Oil Pipeline 惠宁输油管道 (惠安堡-石空)
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":37.5,"lon":106,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":37.43921,"lon":106.66564},{"lat":37.621143,"lon":106.0794},{"lat":37.55655,"lon":105.652718}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
- Operator:
- Owner: 国家管网集团北方管道有限责任公司
- Parent company:
- Capacity:
- Length:
- Diameter:
- Status: Operating
- Start year:
- Cost:
- Financing:
- Associated infrastructure:
Background
The pipeline's source is the Changqing Oil Field. In October 2020 ownership of the pipeline was transferred from CNPC to PipeChina.[4]
Articles and resources
References
Related GEM.wiki articles
External resources
External articles