Malta Hauptstufe hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Other names: Malta Main Stage
Malta Hauptstufe hydroelectric plant is an operating hydroelectric power plant in Reißeck, Bezirk Spittal an der Drau, Carinthia, Austria.
Project Details
Table 1: Project details for Malta Hauptstufe hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner | Operator |
---|---|---|---|---|---|---|
Operating[1] | 1979[2] | 730 MW[1] | 4[2] | Pumped storage[2] | Verbund Hydro Power GmbH [100%][2] | Verbund Hydro Power[2] |
Location
Table 2: Location details for Malta Hauptstufe hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Reißeck, Bezirk Spittal an der Drau, Carinthia, Austria[2] | Drava River, Malta[2] | 46.8701, 13.329 (exact)[2] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20221107230119/https://transparency.entsoe.eu/. Archived from the original on 2022-11-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://web.archive.org/web/20221208201154/https://www.verbund.com/de-at/ueber-verbund/kraftwerke/unsere-kraftwerke/malta-hauptstufe. Archived from the original on 2022-12-08.
{{cite web}}
: Missing or empty|title=
(help)