Manah solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Manah solar farm (محطة منح٢ للطاقة الشمسية, محطة منح ١ للطاقة الشمسية) is a solar photovoltaic (PV) farm in pre-construction in Manah, Ad Dakhiliyah, Oman.
Project Details
Table 1: Phase-level project details for Manah solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Pre-construction[1] | 2025 (planned)[2] | 550 MW[1] | PV[3] | Oman Energy and Water Procurement Firm (OPWP) [100%] (الشركة العمانية لشراء الطاقة والمياه)[4] | Sembcorp Industries; JinkoPower Technologies[2][2] |
2 | Pre-construction[1] | 2025 (planned)[2] | 550 MW[1] | PV[3] | Oman Energy and Water Procurement Firm (OPWP) [100%] (الشركة العمانية لشراء الطاقة والمياه)[4] | Sembcorp Industries; JinkoPower Technologies[5][2][5][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Manah solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Manah, Ad Dakhiliyah, Oman[1] | 22.7903, 57.6096 (approximate)[1] |
2 | Manah, Ad Dakhiliyah, Oman[1] | 22.7903, 57.6096 (approximate)[1] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://web.archive.org/web/20240201132228/https://www.saudigulfprojects.com/2021/05/oman-announces-new-launch-dates-for-manah-solar-ipp/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20240206161333/https://attaqa.net/2023/05/20/%D8%A7%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%B4%D9%85%D8%B3%D9%8A%D8%A9-%D9%81%D9%8A-%D8%B3%D9%84%D8%B7%D9%86%D8%A9-%D8%B9%D9%85%D8%A7%D9%86-%D8%B4%D8%B1%D9%83%D8%A9-%D9%83%D9%88%D8%B1%D9%8A/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240207111532/https://www.thearabianstories.com/2022/05/06/oman-to-add-new-projects-by-2027-to-meet-energy-demands/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20240206191038/https://alroya.om/post/291078/300-%D9%85%D9%84%D9%8A%D9%88%D9%86-%D8%B1%D9%8A%D8%A7%D9%84-%D9%84%D8%AA%D8%B7%D9%88%D9%8A%D8%B1-%D9%85%D8%B4%D8%B1%D9%88%D8%B9%D9%8A-%D9%85%D8%AD%D8%B7%D8%AA%D9%8A-%D9%85%D9%86%D8%AD-1-%D9%882-%D9%84%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%B4%D9%85%D8%B3%D9%8A%D8%A9-%D9%88%D8%A8%D8%AF%D8%A1-%D8%A7%D9%84%D8%AA%D8%B4%D8%BA%D9%8A%D9%84-%D8%A7%D9%84%D8%AA%D8%AC%D8%A7%D8%B1%D9%8A-%D8%A8%D9%86%D9%87%D8%A7%D9%8A%D8%A9-2024. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20240206172644/https://www.seetao.com/details/206742.html. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)