Mangdechhu hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Mangdechhu hydroelectric plant is an operating hydroelectric power plant in Bagochen Boolingpang Ueling, Nubi Gewog, Trongsa District, Bhutan.
Project Details
Table 1: Project details for Mangdechhu hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner | Operator |
---|---|---|---|---|---|---|
Operating[1] | 2019[1] | 720 MW[2] | 4 x 180 MW[2] | Run-of-river[2] | National Hydroelectric Power CORP (NHPC)[2] | Mangdechu Hydro Project Authority (MHPA)[3] |
Location
Table 2: Location details for Mangdechhu hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Bagochen Boolingpang Ueling, Nubi Gewog, Trongsa District, Bhutan[2] | Mangdechhu River[2] | 27.4801, 90.4947 (exact)[2] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20220619230714/https://www.smart-energy.com/regional-news/indian-subcontinent/mangdechhu-hydroelectric-project-a-game-changer-for-bhutan/. Archived from the original on 19 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://web.archive.org/web/20191112171642/https://cdm.unfccc.int/Projects/DB/BVQI1554122442.49/view. Archived from the original on 12 November 2019.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220807222259/https://kuenselonline.com/mhpa-starts-commercial-operation-of-unit-2/. Archived from the original on 07 August 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)