Manglai power station (中煤芒来发电项目) is a power station under construction in Sonid Left Banner, Xilingol, Inner Mongolia, China. It is also known as 中煤芒来2×66万千瓦煤电一体化项目 (Unit 1 & 2), 中煤锡林郭勒芒来发电有限公司2×66万千瓦煤电一体化项目.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Manglai power station Sonid Left Banner, Xilingol, Inner Mongolia, China 43.992903, 113.300505 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 43.992903, 113.300505

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 Construction[1] coal: unknown 660 ultra-supercritical 2025 (planned)
Unit 2 Construction[1] coal: unknown 660 ultra-supercritical 2026 (planned)[2]

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Middling Coal Xilingol Manglai Power Generation Co Ltd [100%] China National Coal Group [70.2%]; Inner Mongolia Sunit State Owned Assets Management Co Ltd [17.2%]; China Guoxin Holding Corp [6.4%]; China Chengtong Holdings Group Ltd [3.6%]; China Energy Investment Corp [2.7%]
Unit 2 Middling Coal Xilingol Manglai Power Generation Co Ltd [100%] China National Coal Group [70.2%]; Inner Mongolia Sunit State Owned Assets Management Co Ltd [17.2%]; China Guoxin Holding Corp [6.4%]; China Chengtong Holdings Group Ltd [3.6%]; China Energy Investment Corp [2.7%]

Background

The 2 × 660 MW ultra-supercritical units were reported to be permitted to build by the Inner Mongolian Development and Reform Commission in December 2022.[3]

In April 2023, Harbin Electric Group Steam Turbine Company won the bid for the procurement of steam turbines and ancillary equipment for the power station.[4] In May 2023, North China Institute won the bid for unit engineering survey and design.[5] In July 2023, bidding for construction supervision began.[6]

Construction starting ceremony was held on 31 August 2023.[7][8]

Articles and Resources

References

  1. 1.0 1.1 "中煤2×660MW煤电一体化项目锅炉基础承台开始浇筑-北极星火力发电网". news.bjx.com.cn. 2023-10-25. Archived from the original on 2024-01-25. Retrieved 2023-11-07.
  2. "中煤芒来电厂低低温静电除尘器设备采购项目招标". https://huanbao.bjx.com.cn/news. 2023-08-07. Archived from the original on 2024-01-25. {{cite web}}: External link in |website= (help)
  3. "中煤芒来2×66万千瓦煤电一体化项目取得核准". 北极星火力发电网. 2022-12-27. Retrieved 2023-02-06.{{cite web}}: CS1 maint: url-status (link)
  4. 哈电集团汽轮机公司成功中标中煤锡林郭勒芒来2×660MW煤电项目, news.bjx.com.cn, 2023-04-20
  5. 【项目】火电|2×1000MW!国家电投分宜发电厂进展!/2×660MW!华北院中标中煤芒来高效超超临界燃煤发电机组工程勘察设计, mp.weixin.qq.com, 2023-05-26
  6. 中煤锡林郭勒芒来发电有限公司芒来电厂项目施工监理服务项目项目公告, dlztb.com, 2023-07-05
  7. "中煤芒来2×660兆瓦高效超超临界燃煤发电机组工程开工!". 北极星电力网. 2023-09-01. Retrieved 2023-9-14. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  8. "中煤集团2×660MW煤电项目正式开工". 电力项目圈. 2023-09-04.{{cite web}}: CS1 maint: url-status (link)