Mantia solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Mantia solar farm (Planta solar fotovoltaica Mantia) is a solar photovoltaic (PV) farm in pre-construction in Yunclillos, Toledo, Castilla-La Mancha, Spain.

Project Details

Table 1: Phase-level project details for Mantia solar farm

Phase name Status Nameplate capacity Technology Owner
2 Pre-construction[1] 110 MWac[2] PV[3] Solaria Promoción y Desarrollo Fotovoltaico SL [100%][4]
3 Pre-construction[5] 24.1 MWac[2] PV[3] Solaria Promoción y Desarrollo Fotovoltaico SL [100%][4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Mantia solar farm

Phase Name Location Coordinates (WGS 84)
2 Yunclillos, Toledo, Castilla-La Mancha, Spain[2] 40.0400, -3.9637 (approximate)[2]
3 Yunclillos, Toledo, Castilla-La Mancha, Spain[2] 40.0400, -3.9637 (approximate)[2]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-33865 https://www.pv-magazine.es/2021/09/16/hibridacion-nuevos-actores-y-solicitud-de-utilidad-publica-mas-de-600-mw-en-los-ultimos-7-dias/, https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-33865. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-33865. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 "Hibridación, nuevos actores y solicitud de utilidad pública: más de 600 MW en los últimos 7 días". pv magazine España. 2021-09-16. Archived from the original on 2024-02-01.
  4. 4.0 4.1 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2818 https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-33865, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2818. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2818, https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-33865 https://www.pv-magazine.es/2021/09/16/hibridacion-nuevos-actores-y-solicitud-de-utilidad-publica-mas-de-600-mw-en-los-ultimos-7-dias/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2818, https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-33865. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)