Mantia solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Mantia solar farm (Planta solar fotovoltaica Mantia) is a solar photovoltaic (PV) farm in pre-construction in Yunclillos, Toledo, Castilla-La Mancha, Spain.
Project Details
Table 1: Phase-level project details for Mantia solar farm
Phase name | Status | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
2 | Pre-construction[1] | 110 MWac[2] | PV[3] | Solaria Promoción y Desarrollo Fotovoltaico SL [100%][4] |
3 | Pre-construction[5] | 24.1 MWac[2] | PV[3] | Solaria Promoción y Desarrollo Fotovoltaico SL [100%][4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Mantia solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
2 | Yunclillos, Toledo, Castilla-La Mancha, Spain[2] | 40.0400, -3.9637 (approximate)[2] |
3 | Yunclillos, Toledo, Castilla-La Mancha, Spain[2] | 40.0400, -3.9637 (approximate)[2] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-33865 https://www.pv-magazine.es/2021/09/16/hibridacion-nuevos-actores-y-solicitud-de-utilidad-publica-mas-de-600-mw-en-los-ultimos-7-dias/, https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-33865.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-33865.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 "Hibridación, nuevos actores y solicitud de utilidad pública: más de 600 MW en los últimos 7 días". pv magazine España. 2021-09-16. Archived from the original on 2024-02-01.
- ↑ 4.0 4.1 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2818 https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-33865, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2818.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2818, https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-33865 https://www.pv-magazine.es/2021/09/16/hibridacion-nuevos-actores-y-solicitud-de-utilidad-publica-mas-de-600-mw-en-los-ultimos-7-dias/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2818, https://www.boe.es/diario_boe/txt.php?id=BOE-B-2023-33865.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)