Mataco wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: El Mataco

Mataco wind farm (Parque Eólico Mataco) is an operating wind farm in Partido de Tornquist, Buenos Aires, Argentina.

Project Details

Table 1: Phase-level project details for Mataco wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
3 Operating[1] 2023[2] 36 MW[2] Onshore[2] Petroquimica Comodoro Rivadavia SA (PCR) [100%][2] Petroquimica Comodoro Rivadavia SA (PCR)[2]

Location

Table 2: Phase-level location details for Mataco wind farm

Phase Name Location Coordinates (WGS 84)
3 Partido de Tornquist, Buenos Aires, Argentina[2] -38.3048, -62.2432 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. "Argentine cement and energy group PCR SA connects three new wind farms totaling 198 MW". 2023-10-27. Archived from the original on 2024-08-28. Retrieved 2024-08-08.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://web.archive.org/web/20240125161607/https://renewablesnow.com/news/vestas-lands-86-mw-wind-turbine-order-in-argentina-777155/. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)