Matnog Wind Power Project
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Matnog 3 Wind Power Project (Phase 3), Matnog 2 Wind Power Project (Phase 2), Matnog 3 (Phase 3), Matnog 1 Wind Power Project (Phase 1), Matnog 1 (Phase 1), Matnog 2 (Phase 2)
Matnog Wind Power Project is a wind farm in pre-construction in Matanog, Luzon Island, Sorsogon Province, Philippines.
Project Details
Table 1: Phase-level project details for Matnog Wind Power Project
Phase name | Status | Nameplate capacity | Type | Owner |
---|---|---|---|---|
1 | Pre-construction[1] | 153 MW[2] | Onshore[2] | Energy Development Corp [100%][1] |
2 | Pre-construction[1] | 206 MW[2] | Onshore[2] | Energy Development Corp [100%][1] |
3 | Pre-construction[1] | 206 MW[2] | Onshore[2] | Energy Development Corp [100%][1] |
Location
Table 2: Phase-level location details for Matnog Wind Power Project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Matanog, Luzon Island, Sorsogon Province, Philippines[2] | 12.8333, 123.9167 (approximate)[2] |
2 | Matanog, Luzon Island, Sorsogon Province, Philippines[2] | 12.8333, 123.9167 (approximate)[2] |
3 | Matanog, Luzon Island, Sorsogon Province, Philippines[2] | 12.8333, 123.9167 (approximate)[2] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240126130145/https://www.asiawind.org/research-data/market-overview/philippines/. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 (PDF) https://web.archive.org/web/20221224051455/http://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_indicative_2022-mar-31-updated-05172022.pdf. Archived from the original (PDF) on 2022-12-24.
{{cite web}}
: Missing or empty|title=
(help)