McGinness Hills 3 geothermal plant
From Global Energy Monitor
This article is part of the Global Geothermal Power Tracker, a Global Energy Monitor project. |
McGinness Hills 3 geothermal plant is an operating geothermal power plant in Lander County, Nevada, United States.
Project Details
Table 1: Unit-level project details for McGinness Hills 3 geothermal plant
Unit name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Operating[1] | 2018[2] | 48 MW[2] | Binary cycle[3] | Ormat Technology Inc [100%][2] |
Location
Table 2: Unit-level location details for McGinness Hills 3 geothermal plant
Unit name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Lander County, Nevada, United States[4] | 39.5933, -116.9126 (exact)[4] |
The map below shows the exact location of the geothermal power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20220511220543/https://www.thinkgeoenergy.com/48-mw-mcginness-hills-phase-3-geothermal-plant-starts-operation-in-nevada/. Archived from the original on 2022-05-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20220629212232/https://www.thinkgeoenergy.com/completion-of-mcginness-hills-geothermal-plant-complex-expansion/. Archived from the original on 2022-06-29.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Global Geothermal Power Plant Map". 2012-01-10. Archived from the original on 2022-11-08. Retrieved 2025-01-06.
{{cite web}}
: Text "ThinkGeoEnergy - Geothermal Energy News" ignored (help) - ↑ 4.0 4.1 https://goo.gl/maps/ab9xmeMsd1VRsf1J8.
{{cite web}}
: Missing or empty|title=
(help)