Međimurje County solar project II
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Međimurje County solar project II is an operating solar farm in Međimurje County, Croatia.
Project Details
Table 1: Phase-level project details for Međimurje County solar project II
Status | Nameplate capacity | Technology |
---|---|---|
Operating[1] | 7.4 MWac[1] | Assumed PV |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Međimurje County solar project II
Location | Coordinates (WGS 84) |
---|---|
Međimurje County, Croatia[1] | 46.3233, 16.7478 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References