Mehraran-Shiraz Oil Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Mehraran-Shiraz Oil Pipeline is an under construction oil pipeline running from Mehraran in Hormozgan Province to Shiraz in Fars, Iran.[1]

Location

The pipeline runs from Mehraran in Hormozgan Province to Shiraz in Fars, Iran.[1]

Loading map...

Project details

  • Operator: National Iranian Oil Refining and Distribution Company
  • Owner: National Iranian Oil Company[2]
  • Parent company: National Iranian Oil Company[2]
  • Capacity: 75000bpd[1]
  • Length: 400km[3]
  • Diameter:
  • Status: Construction
  • Start year:
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

Articles and resources

References

  1. 1.0 1.1 1.2 https://plus.google.com/113403756129291503583 (2022-03-06). "NIORDC, Tejarat Bank Sign MoU to Build Oil Pipeline". Financial Tribune. Retrieved 2024-01-23. {{cite web}}: |last= has generic name (help); External link in |last= (help)
  2. 2.0 2.1 "KeyfactsEnergy". www.keyfactsenergy.com. Retrieved 2024-01-23.
  3. "NIORDC, Tejarat Bank ink MOU for building oil pipeline". Tehran Times. 2022-03-06. Retrieved 2024-01-23.