Menengai 2 geothermal power plant

From Global Energy Monitor
This article is part of the
Global Geothermal Power Tracker, a Global Energy Monitor project.
Report an error

Menengai 2 geothermal power plant is a geothermal power plant in pre-construction in Nakuru North, Nakuru, Kenya.

Project Details

Table 1: Unit-level project details for Menengai 2 geothermal power plant

Status Commissioning year Nameplate capacity Technology Owner Operator
Pre-construction[1] 2025 (planned)[1] 60 MW[2] Flash steam - unknown[2] Geothermal Development Company (GDC) [100%][2] Geothermal Development Company (GDC)[2]

Location

Table 2: Unit-level location details for Menengai 2 geothermal power plant

Location Coordinates (WGS 84)
Nakuru North, Nakuru, Kenya -0.196, 36.063 (exact)

The map below shows the exact location of the geothermal power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20240319062129/https://www.powermag.com/green-light-for-second-geothermal-power-project-in-kenyas-menengai-field/. Archived from the original on 19 March 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://web.archive.org/web/20230209223645/https://www.gdc.co.ke/menengai.html. Archived from the original on 09 February 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)