Mengneng Wulate Front Qi power station (蒙能乌拉特前旗发电项目) is a cancelled power station in Urad Front Banner, Bayannur, Inner Mongolia, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Mengneng Wulate Front Qi power station Urad Front Banner, Bayannur, Inner Mongolia, China 40.736, 108.652 (approximate)

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Status Fuel(s) Capacity (MW) Technology
cancelled coal: unknown 600 unknown

Table 3: Unit-level ownership and operator details

Owner Parent
Inner Mongolia Energy Power Generation Investment Group Co Ltd [100%] Inner Mongolia Autonomous Region State-owned Assets Supervision and Administration Commission [90.0%]; Inner Mongolia State Owned Capital Operation Co Ltd [10.0%]

Background on Project

According to a World Resources Institute report (2012), China Guodian is currently planning to build a coal-fired power plant with a total planned capacity of 600 MW in Inner Mongolia Autonomous Region.[1]

However, there have been no reports of further activity to develop those plans, and they appear to be shelved or abandoned.

Articles and Resources

References

  1. Ailun Yang and Yiyun Cui, "Global Coal Risk Assessment: Data Analysis and Market Research," World Resources Institute working paper, November 2012

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.