Mengneng Wulate Front Qi power station
From Global Energy Monitor
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Mengneng Wulate Front Qi power station (蒙能乌拉特前旗发电项目) is a cancelled power station in Urad Front Banner, Bayannur, Inner Mongolia, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Mengneng Wulate Front Qi power station | Urad Front Banner, Bayannur, Inner Mongolia, China | 40.736, 108.652 (approximate) |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Status | Fuel(s) | Capacity (MW) | Technology |
---|---|---|---|
cancelled | coal: unknown | 600 | unknown |
Table 3: Unit-level ownership and operator details
Owner | Parent |
---|---|
Inner Mongolia Energy Power Generation Investment Group Co Ltd [100%] | Inner Mongolia Autonomous Region State-owned Assets Supervision and Administration Commission [90.0%]; Inner Mongolia State Owned Capital Operation Co Ltd [10.0%] |
Background on Project
According to a World Resources Institute report (2012), China Guodian is currently planning to build a coal-fired power plant with a total planned capacity of 600 MW in Inner Mongolia Autonomous Region.[1]
However, there have been no reports of further activity to develop those plans, and they appear to be shelved or abandoned.
Articles and Resources
References
- ↑ Ailun Yang and Yiyun Cui, "Global Coal Risk Assessment: Data Analysis and Market Research," World Resources Institute working paper, November 2012
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.