Mengtai Beijiao power station (蒙泰东胜北骄热电厂) is an operating power station of at least 1980-megawatts (MW) in Dongsheng, Ordos, Inner Mongolia, China. It is also known as 蒙泰东胜北骄热电一厂 (Unit 1, Unit 2), 蒙泰北源热电联产项目 (Unit 3, Unit 4), 蒙泰东胜热电二期 (Unit 3, Unit 4), Mengtai Dongsheng power station; 蒙泰东胜热电一期 (Unit 1, Unit 2), 蒙泰东胜北骄热电二厂 (Unit 3, Unit 4).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Mengtai Beijiao power station | Dongsheng, Ordos, Inner Mongolia, China | 39.846544, 109.984433 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 39.846544, 109.984433
- Unit 3, Unit 4: 39.846004, 109.984888
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 1 | operating | coal: waste coal | 330 | subcritical | 2015 |
Unit 2 | operating | coal: waste coal | 330 | subcritical | 2015 |
Unit 3 | operating | coal: waste coal | 660 | subcritical | 2022 |
Unit 4 | operating[1] | coal: waste coal | 660 | supercritical | 2023[1] |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Ordos Beijiao Thermal Power Co Ltd [100%] | INNER MONGOLIA Mengtai Croup Co [100.0%] |
Unit 2 | Ordos Beijiao Thermal Power Co Ltd [100%] | INNER MONGOLIA Mengtai Croup Co [100.0%] |
Unit 3 | Ordos Beijiao Thermal Power Co Ltd [100%] | INNER MONGOLIA Mengtai Croup Co [100.0%] |
Unit 4 | Ordos Beijiao Thermal Power Co Ltd [100%] | INNER MONGOLIA Mengtai Croup Co [100.0%] |
Project-level coal details
- Permit(s):
Background on Project
Mengtai Coal Power Group has been permitted to build a 2 x 330 MW coal plant in Dongsheng District. Coal supply would be domestic.[2][3]
The units were completed in 2015.[4]
Expansion
Two additional 330 MW subcritical coal units began preliminary construction near the power station in 2018,[5] although they do not have a permit for construction.[6]
In May 2020, the project was permitted as 2 x 660 MW coal-fired units.[7] Construction began in August 2020.[8]
Unit 3 went into operation in December 2022.[9]
Articles and Resources
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240125130931/https://www.cpnn.com.cn/qiye/guanli/202301/t20230113_1578723.html. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "内蒙古核准17个火电项," 北极星电力网新闻中心, 2015/9/6
- ↑ "蒙泰东胜2×330MW低热值煤热电联产项目环境影响评价公众参与首次公示," 2014-01-16
- ↑ "关于鄂尔多斯市蒙泰东胜热电联产低热值煤发电项目核准的批复 信息来源," 2015-09-01
- ↑ "鄂尔多斯市北骄热电有限责任公司," Mengtai Coal Power Group, accessed Jan 2018
- ↑ "内蒙古发布环保违规建设项目3050个," H2O China, 2016-12-19
- ↑ "蒙泰东胜二期2×66万千瓦热电联产项目获得核准," 北极星电力网新闻中心, 2020/5/15
- ↑ "中国能建西北院设计蒙泰东胜二期热电联产项目开工," China5e, 2020-08-06
- ↑ "2×660MW!内蒙古蒙泰东胜二期热电3号机组投产," BJX, 2022-12-16