Mengtai Beijiao power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Mengtai Beijiao power station (蒙泰东胜北骄热电厂) is an operating power station of at least 1980-megawatts (MW) in Dongsheng, Ordos, Inner Mongolia, China. It is also known as 蒙泰东胜北骄热电一厂 (Unit 1, Unit 2), 蒙泰北源热电联产项目 (Unit 3, Unit 4), 蒙泰东胜热电二期 (Unit 3, Unit 4), Mengtai Dongsheng power station; 蒙泰东胜热电一期 (Unit 1, Unit 2), 蒙泰东胜北骄热电二厂 (Unit 3, Unit 4).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Mengtai Beijiao power station Dongsheng, Ordos, Inner Mongolia, China 39.846544, 109.984433 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 39.846544, 109.984433
  • Unit 3, Unit 4: 39.846004, 109.984888

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 operating coal: waste coal 330 subcritical 2015
Unit 2 operating coal: waste coal 330 subcritical 2015
Unit 3 operating coal: waste coal 660 subcritical 2022
Unit 4 operating[1] coal: waste coal 660 supercritical 2023[1]

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Ordos Beijiao Thermal Power Co Ltd [100%] INNER MONGOLIA Mengtai Croup Co [100.0%]
Unit 2 Ordos Beijiao Thermal Power Co Ltd [100%] INNER MONGOLIA Mengtai Croup Co [100.0%]
Unit 3 Ordos Beijiao Thermal Power Co Ltd [100%] INNER MONGOLIA Mengtai Croup Co [100.0%]
Unit 4 Ordos Beijiao Thermal Power Co Ltd [100%] INNER MONGOLIA Mengtai Croup Co [100.0%]

Project-level coal details

  • Permit(s):

Background on Project

Mengtai Coal Power Group has been permitted to build a 2 x 330 MW coal plant in Dongsheng District. Coal supply would be domestic.[2][3]

The units were completed in 2015.[4]

Expansion

Two additional 330 MW subcritical coal units began preliminary construction near the power station in 2018,[5] although they do not have a permit for construction.[6]

In May 2020, the project was permitted as 2 x 660 MW coal-fired units.[7] Construction began in August 2020.[8]

Unit 3 went into operation in December 2022.[9]

Articles and Resources

References

  1. 1.0 1.1 https://web.archive.org/web/20240125130931/https://www.cpnn.com.cn/qiye/guanli/202301/t20230113_1578723.html. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. "内蒙古核准17个火电项," 北极星电力网新闻中心, 2015/9/6
  3. "蒙泰东胜2×330MW低热值煤热电联产项目环境影响评价公众参与首次公示," 2014-01-16
  4. "关于鄂尔多斯市蒙泰东胜热电联产低热值煤发电项目核准的批复 信息来源," 2015-09-01
  5. "鄂尔多斯市北骄热电有限责任公司," Mengtai Coal Power Group, accessed Jan 2018
  6. "内蒙古发布环保违规建设项目3050个," H2O China, 2016-12-19
  7. "蒙泰东胜二期2×66万千瓦热电联产项目获得核准," 北极星电力网新闻中心, 2020/5/15
  8. "中国能建西北院设计蒙泰东胜二期热电联产项目开工," China5e, 2020-08-06
  9. "2×660MW!内蒙古蒙泰东胜二期热电3号机组投产," BJX, 2022-12-16

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.