Mengzhou cogen power station (孟州市产业集聚区热源整合改建热电联产项目) is a power station in Industial Zone, Mengzhou, Jiaozuo, Henan, China with multiple units of varying statuses, none of which are currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Mengzhou cogen power station | Industial Zone, Mengzhou, Jiaozuo, Henan, China | 34.8979, 112.729639 (approximate) |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase I Unit 1 | construction | coal: unknown | 30 | CFB | 2024 (planned) |
Phase II Unit 2 | announced | coal: unknown | 30 | CFB | 2024 (planned) |
Phase II Unit 3 | announced | coal: unknown | 30 | CFB | 2024 (planned) |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | Mengzhou Rongxing Energy Technology Co Ltd [100%] | Mengzhou Hairong Co Ltd [100.0%] |
Phase II Unit 2 | Mengzhou Rongxing Energy Technology Co Ltd [100%] | Mengzhou Hairong Co Ltd [100.0%] |
Phase II Unit 3 | Mengzhou Rongxing Energy Technology Co Ltd [100%] | Mengzhou Hairong Co Ltd [100.0%] |
Project-level coal details
- Permit(s):
Background
At least one 30 MW unit at the site appeared underway around 2020 (and may have been related to permitting document "焦发改能源〔2020〕100 号"), with construction starting soon after based on satellite imagery. In April 2022, Mengzhou Rongxing Energy Technology Company published the details of an Environmental Impact Assessment (EIA) for a new 30 MW cogeneration power project in Mengzhou City, Henan Province, China.[1] In the EIA report, it was mentioned that the bulk of construction of Phase I of the project was already complete, which designated the project to a category of power projects that had begun "pre-construction without approval."[2] The report stated that the project was to use circulating fluidized bed combustion technology.[2]
In August 2022 it was reported that Phase I of the proposed power project had passed the Energy-saving Assessment by the Provincial Development and Reform Commission.[3]
In the summarized April 2022 Environmental Impact Report for the Mengzhou power plant, Mengzhou Rongxing Energy Technology Company mentioned an additional planned capacity of two circulating fluidized bed units of 30 MW each.[2]
Articles and Resources
References
- ↑ 孟州市容兴能源科技有限公司孟州市产业集聚区热源整合改建热电联产项目(一期)环境影响评价公众参与第二次信息公示, 州市华兴有限责任公司官方网站, April 26, 2022
- ↑ 2.0 2.1 2.2 孟州市容兴能源科技有限公司孟州市产业集聚区热源整合改建热电联产项目(一期)环境影响报告书(公示稿), 孟州市容兴能源科技有限公司 April, 2022
- ↑ 河南孟州:解难题破瓶颈办实事, 人民网-河南频道, August. 19, 2022