Michinoku wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Michinoku wind power generation
Michinoku wind farm (みちのく風力発電) is a cancelled wind farm in Aomori, Aomori Prefecture, Japan.
Project Details
Table 1: Phase-level project details for Michinoku wind farm
Status | Nameplate capacity | Type | Owner |
---|---|---|---|
Cancelled[1] | 600 MW[2] | Onshore[3] | Eurus Energy Holdings Corp [100%] (株式会社ユーラスエナジーホールディングス)[4] |
Location
Table 2: Phase-level location details for Michinoku wind farm
Location | Coordinates (WGS 84) |
---|---|
Aomori, Aomori Prefecture, Japan[2] | 40.8332, 140.7022 (approximate)[2] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ "八甲田山で計画されていた「(仮称)みちのく風力発電事業」が事業廃止に!". 日本自然保護協会オフィシャルサイト. 2023-10-11. Archived from the original on 2024-09-24. Retrieved 2024-09-20.
- ↑ 2.0 2.1 2.2 https://web.archive.org/web/20240125184845/https://www.meti.go.jp/policy/safety_security/industrial_safety/sangyo/electric/detail/furyoku_michinokufuryoku.html. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126082434/https://www.nikkei.com/article/DGXZQOCC024TP0S2A800C2000000/. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220221023140/https://www.eurus-energy.com/assessment/26566/. Archived from the original on 21 February 2022.
{{cite web}}
: Missing or empty|title=
(help)