Midor Refinery power plant

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Midor Refinery power plant (محطة ميدور للكهرباء "ميداليك") is an operating power station of at least 183-megawatts (MW) in Amreya freezone, Qetaa an Nahdah, Alexandria, Egypt.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Midor Refinery power plant Amreya freezone, Qetaa an Nahdah, Alexandria, Egypt 31.027605, 29.762536 (exact)[1][2]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 1, 2, 3: 31.027605, 29.762536

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1 Operating[3] fossil gas: natural gas[4][5] 61[4] gas turbine[4][6] not found 2000[7]
2 Operating[3] fossil gas: natural gas[4] 61[4] gas turbine[4][6] not found 2000[7]
3 Operating[3] fossil gas: natural gas[4] 61[4] gas turbine[4][6] not found 2001[7]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 MIDOR Electricity [100%][8] Egyptian General Petroleum Corp; Engineering for the Petroleum & Process Industries
2 MIDOR Electricity [100%][8] Egyptian General Petroleum Corp; Engineering for the Petroleum & Process Industries
3 MIDOR Electricity [100%][8] Egyptian General Petroleum Corp; Engineering for the Petroleum & Process Industries

Project-level captive use details

  • Captive industry use (heat or power): power[3]
  • Captive industry: Oil & Refining[3]
  • Non-industry use: power[3]


Articles and Resources

References

  1. https://www.google.com/maps/place/MIDELEC+PowerStation/@31.0266193,29.7627988,479m/data=!3m1!1e3!4m5!3m4!1s0x14f592e62eb84d7b:0x83f21a889b031185!8m2!3d31.0279901!4d29.7624296. {{cite web}}: Missing or empty |title= (help)
  2. https://midelec-gtpp.business.site/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20210714165944/https://enterprise.press/stories/2020/05/07/midelec-to-borrow-eur-30-mn-to-boost-power-to-midor-refinery-15619/. Archived from the original on 14 July 2021. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 https://web.archive.org/web/20210714183743/http://www.winne.com/egypt2/to13.html. Archived from the original on 14 July 2021. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20220704132409/http://www.moee.gov.eg/Arabic/EgyComp/Generating.html. Archived from the original on 04 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. 6.0 6.1 6.2 https://web.archive.org/web/20220620234859/http://www.moee.gov.eg/English_new/EgyComp-EN/fr_Generating.htm. Archived from the original on 20 June 2022. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 https://www.ogj.com/home/article/17220219/egypt-builds-highconversion-refinery. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 https://web.archive.org/web/20210714175216/http://www.midor.com.eg/Pages/Business/Sister_Companies.aspx?HPNAvId=3&PNAvId=24. Archived from the original on 14 July 2021. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.