Midway (California) solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Midway (California) solar farm is an operating solar photovoltaic (PV) farm in Imperial County, California, United States.
Project Details
Table 1: Phase-level project details for Midway (California) solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2018[1] | 50 MWac[1] | PV[1] | Avantus; Gestamp Solar[2][3][2][3] | Avantus[2][3] |
2 | Operating[1] | 2017[1] | 30 MWac[1] | PV[1] | Dominion Energy Inc [100%][4][5] | Dominion Energy[1] |
3 | Operating[1] | 2018[1] | 20 MWac[1] | PV[1] | Greenbacker Renewable Energy Company LLC [100%][6] | Greenbacker Renewable Energy Company LLC[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Midway (California) solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Imperial County, California, United States[7] | 33.165, -115.54 (exact)[7] |
2 | Imperial County, California, United States[7] | 33.158, -115.541 (exact)[7] |
3 | Imperial County, California, United States[7] | 33.173, -115.549 (exact)[7] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 https://web.archive.org/web/20240125152804/https://www.eia.gov/electricity/data/eia860m/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20240206175028/https://www.pv-tech.org/us-developer-8minute-solar-energy-rebrands-as-avantus/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20220211192446/https://www.8minute.com/2014/03/gestamp-solar-and-8minute-renewables-to-build-50mw-solar-farm/. Archived from the original on 11 February 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240206202018/https://www.dominionenergy.com/projects-and-facilities/solar-energy-facilities-and-projects/california-solar-projects. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220208041919/https://trimarkassoc.com/midway-ii-solar-project-hand-off-smoothest-in-a-very-long-time%EF%BB%BF/. Archived from the original on 08 February 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220208013129/https://www.mccarthy.com/insights/mccarthy-completes-new-20-mw-solar-project-imperial-county-calif. Archived from the original on 08 February 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 https://web.archive.org/web/20240402052142/https://wiki-solar.org/. Archived from the original on 02 April 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)