Millbrook power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Millbrook power station is a power station in pre-construction in Stewartby, Bedfordshire, United Kingdom. It is also known as Rookery Millbrook.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Millbrook power station | Stewartby, Bedfordshire, United Kingdom | 52.0704, -0.51482 (approximate)[1] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Pre-construction[2][3][4] | fossil gas: natural gas[5] | 299[5] | gas turbine[5] | not found | 2024 (planned)[5] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Millbrook Power Co Ltd [100%][6] | Drax Group PLC [100.0%] |
Background
Millbrook, originally expected to start in 2022, is listed in the T-4 Capacity Market 2024-2025 final auction results with a 2024 delivery date.[7][8] This would qualify it for government subsidies to guarantee electricity supply.[9]
Articles and Resources
References
- ↑ https://www.google.com/maps/place/52%C2%B004'13.4%22N+0%C2%B030'53.4%22E/@52.0704,0.51482,17z/data=!3m1!4b1!4m4!3m3!8m2!3d52.0704!4d0.51482?entry=ttu.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220401110839/https://www.mytilineos.gr/news/press-releases/mytilineos-undertakes-the-development-of-3-ocgts-for-drax-30-03-22/. Archived from the original on 01 April 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240124234711/https://www.emrdeliverybody.com/CM/Registers.aspx. Archived from the original on 24 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.drax.com/about-us/our-projects/millbrook-power/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 https://web.archive.org/web/20220904165602/https://www.emrdeliverybody.com/Capacity%20Markets%20Document%20Library/Capacity%20Market%20Register%202024-25%20(T-4)%20-%2013_04_2021.xlsx. Archived from the original on 04 September 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220523213318/https://www.nsenergybusiness.com/projects/millbrook-power-station-england/. Archived from the original on 23 May 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ T4 DY2024-25 Final Results, Electricity Market Reform Delivery Body, Mar 22, 2021
- ↑ The Drax gas plant is dead: But other new gas projects are a headache for the COP26 team, Ember, Feb 15, 2021
- ↑ Capacity Market, United Kingdom, Mar 1, 2019
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.