Milo solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: BNGR Milo solar farm

Milo solar farm is an operating solar photovoltaic (PV) farm in Milo, Piscataquis County, Maine, United States.

Project Details

Table 1: Phase-level project details for Milo solar farm

Status Commissioning year Nameplate capacity Technology Owner Operator
Operating[1] 2021[1] 20 MWac[2] PV[2] BNRG Renewables [100%][3] BNRG Renewables[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Milo solar farm

Location Coordinates (WGS 84)
Milo, Piscataquis County, Maine, United States[2] 45.267, -68.991 (exact)[2]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20240206145033/https://www.newscentermaine.com/article/tech/maines-largest-solar-power-project-milo-solar-is-energized/97-2236dae2-aa23-4838-aa5a-48bab2001388. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240125152804/https://www.eia.gov/electricity/data/eia860m/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20220211170309/https://www.dirigosolar.com/projects/bd-solar-1-llc-2/. Archived from the original on 11 February 2022. {{cite web}}: Missing or empty |title= (help)