Mine at Duong Huy

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Mine at Duong Huy is an operating coal mine in Quang Ninh, Vietnam.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Mine at Duong Huy Quang Ninh, Vietnam 21.039846, 107.250509 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Operating[1] 1978[2] 2030 (planned)[3]

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
2[4] 1.8 2021 Underground Longwall[5] 3.6[6] 250[5] 1766*

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
18.7[7] Cam Pha Anthracite Thermal

Table 5: Ownership and parent company

Owner Parent Company Headquarters
Duong Huy Coal Company Vietnam National Coal and Mineral Industries Holding Corp Ltd Vietnam

Table 6: Historical production (unit: million tonnes per annum)

ROM or Saleable 2017 2018 2019 2020 2021 2022 2023
ROM 2[8] 2[9] 2[10] 2[11] 2[12] 2[13]

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.

Background

Mine at Duong Huy is operated by Duong Huy Coal Company, a subsidiary of Vietnam National Coal (Vinacomin), in Cam Pha, Vietnam.[14] The mine is operated by Duong HuyCoal Company, a subsidiary of Vietnam National Coal (Vinacomin).[14]

  • Sponsor: Duong Huy Coal Company
  • Parent Company: Vietnam National Coal (Vinacomin)
  • Location: Cam Pha, Vietnam
  • GPS Coordinates: 21.039846, 107.250509
  • Status: Operating[15]
  • Capacity: 2 mtpa[14]
  • Production: 1.8 million tonnes (2021)[16]
  • Total Resource:
  • Mineable Reserves:
  • Coal type: Anthracite
  • Mine Size:
  • Mine Type: Underground[15]
  • Start Year:
  • Source of Financing:

Related GEM.wiki articles

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. Duong Huy Coal: 44 years of construction and growth | Vietnam Energy Magazine (nangluongvietnam.vn)
  2. Duong Huy Coal: 44 years of construction and growth | Vietnam Energy Magazine (nangluongvietnam.vn)
  3. Implementation of Khe Tam coal mine exploitation plan (floor -100/-250) | Vietnam Energy Magazine (nangluongvietnam.vn)
  4. (PDF) http://potopk.com.pl/Full_text/2018_full/IM%201-2018-a40.pdf. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20240726173559/https://www.bing.com/ck/a?!&&p=a6e07b4f2d922c9bJmltdHM9MTY5Njg5NjAwMCZpZ3VpZD0zNDE0ZDVlNy02YjlkLTY3ODUtMWUxMi1kYWQ1NmExOTY2NmEmaW5zaWQ9NTIzMg&ptn=3&hsh=3&fclid=3414d5e7-6b9d-6785-1e12-dad56a19666a&psq=Duong+Huyen+coal+mine&u=a1aHR0cHM6Ly9iaWJsaW90ZWthbmF1a2kucGwvYXJ0aWNsZXMvMjAyMDI1MC5wZGY&ntb=1. Archived from the original on 26 July 2024. {{cite web}}: Missing or empty |title= (help)
  6. Methane Content Estimation in DuongHuy Coal Mine (e3s-conferences.org)
  7. Implementation of Khe Tam coal mine exploitation plan (floor -100/-250) | Vietnam Energy Magazine (nangluongvietnam.vn)
  8. https://thanduonghuy-com-vn.translate.goog/bv/san-xuat-kinh-doanh-c24/than-duong-huy-hoan-thanh-xuat-sac-nhiem-vu-sxkd-nam-2018-p172?_x_tr_sl=vi&_x_tr_tl=en&_x_tr_hl=en&_x_tr_pto=sc. {{cite web}}: Missing or empty |title= (help)
  9. https://thanduonghuy-com-vn.translate.goog/bv/san-xuat-kinh-doanh-c24/than-duong-huy-can-moc-2-trieu-tan-than-khai-thac-tu-ham-lo-p250?_x_tr_sl=vi&_x_tr_tl=en&_x_tr_hl=en&_x_tr_pto=sc. {{cite web}}: Missing or empty |title= (help)
  10. https://thanduonghuy-com-vn.translate.goog/bv/san-xuat-kinh-doanh-c24/than-duong-huy-gap-rut-chuan-bi-cac-dieu-kien-phuc-vu-san-xuat-nam-2021-va-nhung-nam-tiep-theo-p434?_x_tr_sl=vi&_x_tr_tl=en&_x_tr_hl=en&_x_tr_pto=sc. {{cite web}}: Missing or empty |title= (help)
  11. https://thanduonghuy-com-vn.translate.goog/bv/san-xuat-kinh-doanh-c24/than-duong-huy-2021-10-su-kien-noi-bat-p621?_x_tr_sl=vi&_x_tr_tl=en&_x_tr_hl=en&_x_tr_pto=sc. {{cite web}}: Missing or empty |title= (help)
  12. https://nangluongvietnam.vn/cong-ty-than-duong-huy-vuot-qua-kho-khan-ve-dich-thang-loi-30041.html. {{cite web}}: Missing or empty |title= (help)
  13. https://congdoantkv.vn/tin-tuc/chi-tiet/39237/Than-Duong-Huy-phan-%C4%91au-nam-2024-%C4%91at-cong-suat-thiet-ke-mo-san-xuat-25-trieu-tan-than. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 Van How Pham, Xuan Nam But, Van Quyen Le, The The Hot Le, and Van Viet Pham, "Estimation of Truck-Shovel Dispatching in Car Son Open Pit Coal Mine and the Ability in Applying Information Technology for Increasing Its Efficiency", Journal of the Polish Mineral Engineering Society, February 2020:21:27
  15. 15.0 15.1 M.G. Mustafin, Tran Thanh-Son, Tran Manh-Hung, Comprehensive impact assessment development of the Coal field Campha in Vietnam to the coastal territory,IOP Conference Series: Materials Science and Engineering 698 (2019)
  16. Research, Calculation and Proposal of Ventilation Solution for Duong Huy Coal Mine when Mining Down to -250 m Depth, Inzynieria Mineralna 1, December 2021