Mine at Mao Khe
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Mine at Mao Khe is an operating coal mine in Quang Ninh, Vietnam.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Mine at Mao Khe | Quang Ninh, Vietnam | 21.07, 106.62 (approximate) |
The map below shows the approximate location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating | – | – | 2048 (planned)[1] |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
1[2] | 2.08[3] | 2022[3] | Underground & Surface[1] | – | – | 400[4] | 1864* |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
52 | – | – | – | Bituminous | Thermal | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
Mao Khe Coal Company | Vietnam National Coal and Mineral Industries Holding Corp Ltd | Vietnam |
Table 6: Historical production (unit: million tonnes per annum)
ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 |
---|---|---|---|---|---|---|---|
ROM | – | 1[5] | 1[6] | 1[7] | 1[7] | 2[3] | 2[8] |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.
Background
Mine at Mao Khe is operated by Mao Khe Coal Company, a subsidiary of Vietnam National Coal (Vinacomin), in Vietnam.[9] The Mao Khe mine is operated by Mao Khe Coal Company, a subsidiary of Vietnam National Coal (Vinacomin).[9]
- Operator: Mao Khe Coal Company
- Owner: Vietnam National Coal (Vinacomin)
- Location: Vietnam
- GPS Coordinates: 21.07, 106.62 (approximate)
- Status: Operating[10]
- Production Capacity: 1.6 mtpa[9][11]
- Total Resource:
- Mineable Reserves: 59 million tonnes [12]
- Coal type: Bituminous
- Mine Size:
- Mine Type: Underground & Surface[13]
- Start Year:
- Source of Financing:
Related GEM.wiki articles
Extension
In 2019, coal at shallow levels of the mine was exhausted. In order to maintain the mine, Vinacomin assigned Mao Khe company to implement the Mao Khe project to exploit pit mining below depths of 150 meters. Mining operations at this level were expected to generate coal starting in 2021.[14]
The project, which has a planned capacity of 2 million tons per year and an expected life time of 32 years, was first proposed in November 2014.[14]
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://www.globaldata.com/data-insights/mining/vietnam--five-largest-surface-and-underground-mines-in-2090926/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) http://potopk.com.pl/Full_text/2018_full/IM%201-2018-a40.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://nangluongvietnam.vn/2022-la-nam-dau-tien-than-mao-khe-san-xuat-tren-2-trieu-tan-than-30120.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240819163942/https://www.researchgate.net/publication/339851116_The_status_and_prospect_of_mining_technology_in_Vietnam_underground_coal_mines. Archived from the original on 19 August 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://baoquangninh.vn/cong-ty-than-mao-khe-day-manh-san-xuat-cuoi-nam-2403205.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://tapchicongthuong.vn/truyen-thong-65-nam-than-mao-khe--duoc-phat-huy-nho--3-hoa-67811.htm.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://congdoantkv.vn/tin-tuc/chi-tiet/25568/Cong-ty-than-Mao-Khe-trien-khai-nhiem-vu-SXKD-nam-2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://quangninh.gov.vn/chuyen-de/chuyendoiso/Trang/ChiTietTinTuc.aspx?nid=134451.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 Van How Pham, Xuan Nam But, Van Quyen Le, The The Hot Le, and Van Viet Pham, "Estimation of Truck-Shovel Dispatching in Car Son Open Pit Coal Mine and the Ability in Applying Information Technology for Increasing Its Efficiency", Journal of the Polish Mineral Engineering Society, February 2020:21:27
- ↑ M.G. Mustafin, Tran Thanh-Son, Tran Manh-Hung, Comprehensive impact assessment development of the Coal field Campha in Vietnam to the coastal territory,IOP Conference Series: Materials Science and Engineering 698 (2019)
- ↑ Chu Thi Que, Marina Nevskaya, Oksana Marinina, Coal Mines in Vietnam: Geological Conditions and Their Influence on Production Sustainability Indicators, Sustainability, 26 October 2021
- ↑ Vietnam Energy Online, "Starting the Underground mining project below -150 of Mao Khe mine", Nanloung Vietnam website, Accessed June 2021
- ↑ Global Data,"Vietnam: Five Largest Surface and Underground Mines in 2021", Accessed October 2023
- ↑ 14.0 14.1 "Mao Khe project with a pit level of -150m will generate coal in 2021", Vietnam Energy Online, 25 October 2019.