Minsk CHP-3 power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Minsk CHP-3 power station (Минская ТЭЦ-3) is an operating power station of at least 512-megawatts (MW) in Minsk, Belarus with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Minsk CHP-3 power station | Minsk, Minsk, Belarus | 53.880102, 27.649027 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 3, 5, 6, 7, 8: 53.880102, 27.649027
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
3 | Operating[2] | fossil gas: natural gas[2] | 222[2][3][4][5] | combined cycle[2][3] | yes[2] | 2009[2] | – |
5 | Retired[6][3][7][8] | fossil gas: natural gas[9][8] | 60[9][8][7] | steam turbine[9] | yes[2] | 1951[8] | 2022[6] |
6 | Operating[10][3][7] | fossil gas: natural gas[9][8] | 60[9][8][7] | steam turbine[9] | yes[2] | 1951[8] | – |
7 | Operating[2][11][12][13][14][5] | fossil gas: natural gas[2] | 115[2][7] | steam turbine[15] | yes[2] | 2022[2][16][12][5][17] | – |
8 | Operating[13][18][19][20][7] | fossil gas: natural gas[2] | 115[20] | steam turbine[20][15][18] | yes[2] | 2023[7][18][19] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
3 | Minskenergo RUE [100%][2] | BelEnergo State Production Association of Power Industry [100.0%] |
5 | Minskenergo RUE [100%][2] | BelEnergo State Production Association of Power Industry [100.0%] |
6 | Minskenergo RUE [100%][2] | BelEnergo State Production Association of Power Industry [100.0%] |
7 | Minskenergo RUE [100%][2] | BelEnergo State Production Association of Power Industry [100.0%] |
8 | Minskenergo RUE [100%][2] | BelEnergo State Production Association of Power Industry [100.0%] |
Background
Unit 3 consists of two turbines: the GT-1 GT13E2 Alstrom turbine with capacity of 168 MW and the UTMZ turbine ST T-53/67-8 with capacity of 54 MW. [21][22] Unit 7 was commissioned in April 2022[23] and replaced units 1 and 2.
According to "The Comprehensive Program of Modernization of the Energy Sector in 2021-2025" issued by the Ministry of Energy of Belarus on April 5, 2021, Unit 8 was planned to be commissioned in 2021-2025 and units 5 was to retire in 2023[24]. In February 2023, Unit 8 was undergoing commissioning and start-up[25], however, the Ministry of Energy had reported the project as completed already in December 2022[26].
Articles and Resources
References
- ↑ https://www.google.com/maps/place/CHP-3+Power+Station/@53.880102,27.6468383,619m/data=!3m1!1e3!4m5!3m4!1s0x46dbce0b73141aaf:0x2ddb07309ac5752!8m2!3d53.8791341!4d27.6478149.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 https://web.archive.org/web/20211017114159/https://minskenergo.by/filialy/minskaya-tets-3/. Archived from the original on 17 October 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 https://web.archive.org/web/20240405042539/https://globalenergyobservatory.org/form.php?pid=43037. Archived from the original on 05 April 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20210421200707/http://www.tsem.by/lic/ref-list-en.pdf. Archived from the original (PDF) on 21 April 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20220709034801/https://energas.ru/pressroom/news/v-minske-rekonstruiruetsya-tets-3/. Archived from the original on 09 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 6.0 6.1 https://belenergo.by/content/infocenter/archive/na-minskoy-tets-3-zavershena-rekonstruktsiya-s-zamenoy-vybyvayushchikh-moshchnostey-14-mpa-1-aya-och__12224/?backurl=%2Fcontent%2Finfocenter%2Farchive%2F%3Ftag%3D%25D0%2592%25D0%2598%25D0%25AD.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 7.6 (PDF) https://energodoc.by/js/pdfjs/web/viewer.html?file=/file/fulltext-view/8720.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 8.4 8.5 8.6 (PDF) https://rep.bntu.by/bitstream/handle/data/63200/460-462.pdf?sequence=1.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 9.4 9.5 (PDF) https://web.archive.org/web/20220520034804/http://beltei.by/wp-content/uploads/doc/power_inspection_the_minsk_tps_3.pdf. Archived from the original (PDF) on 20 May 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://rep.bntu.by/bitstream/handle/data/63200/460-462.pdf?sequence=2.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20231213201113/https://www.belta.by/economics/view/rup-minskenergo-zavoevalo-gran-pri-konkursa-lider-energoeffektivnosti-2023-602072-2023/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 https://web.archive.org/web/20220709030227/https://primepress.by/news/kompanii/minskaya_tets_3_zapustila_v_ekspluatatsiyu_novoe_energeticheskoe_oborudovanie-43316/. Archived from the original on 09 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 13.0 13.1 https://web.archive.org/web/20230131233613/https://web.minskenergo.by/istoricheskaya-spravka/. Archived from the original on 31 January 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230529205246/https://web.minskenergo.by/filialy/minskaya-tets-3/. Archived from the original on 29 May 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 https://web.archive.org/web/20211024141238/http://en.energas.ru/pressroom/news/v-minske-rekonstruiruetsya-tets-3/. Archived from the original on 24 October 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20220911200244/https://www.minenergo.gov.by/wp-content/uploads/2021/%D0%9F%D0%9A%D0%9C%D0%AD%202025-%D1%81.pdf. Archived from the original (PDF) on 11 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211022181026/https://belenergo.by/content/infocenter/news/na-minskoy-tets-3-nachalas-aktivnaya-faza-rekonstruktsii__11267/. Archived from the original on 22 October 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 18.0 18.1 18.2 https://energybase.ru/news/companies/advis-delegacia-respubliki-belarus-posetila-utz-2023-02-17.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 https://web.archive.org/web/20221225061012/https://t.me/Minenergo_by/1076. Archived from the original on 25 December 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 20.0 20.1 20.2 https://primepress.by/news/kompanii/minskaya_tets_3_zavershila_ocherednoy_etap_rekonstruktsii-47013/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "en.energas.ru/pressroom/news/v-minske-rekonstruiruetsya-tets-3/". Archived from the original on May 7, 2021.
- ↑ http://globalenergyobservatory.org/includes/utilities/analysis/analysisPlot.php?format=View_Table&graph=false&module=Units&bestfit=false&ex_year=0&fields0=Individual_Units&noOfFields=1&country0=20&noOfCountries=1&state0=0&noOfStates=1&type0=2&noOfTypes=1
- ↑ "Минская ТЭЦ-3 запустила в эксплуатацию новое энергетическое оборудование". Archived from the original on July 9, 2022. Retrieved July 13, 2022.
- ↑ "minenergo.gov.by/wp-content/uploads/2021/%D0%9F%D0%9A%D0%9C%D0%AD%202025-%D1%81.pdf" (PDF). Archived (PDF) from the original on June 18, 2022. Retrieved July 13, 2022.
- ↑ "Делегация Республики Беларусь посетила УТЗ". energybase.ru. February 17, 2023. Retrieved April 28, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "На Минской ТЭЦ-3 завершили очередной этап реконструкции". Telegram: Минэнерго Официальный. December 23, 2022. Retrieved April 28, 2023.
{{cite web}}
: CS1 maint: url-status (link)
Additional data