Miranda Douro hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Miranda Douro hydroelectric plant is an operating hydroelectric power plant in Miranda do Douro, Bragança, Portugal.
Project Details
Table 1: Project details for Miranda Douro hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner |
---|---|---|---|---|---|
Operating[1] | 1960[2] | 180 MW[1] | 3[3] | Run-of-river[1] | ENGIE [40%]; Crédit Agricole Assurances [35%]; Mirova [25%][4] |
Location
Table 2: Location details for Miranda Douro hydroelectric plant
Location | Coordinates (WGS 84) |
---|---|
Miranda do Douro, Bragança, Portugal[3] | 41.4898, -6.2639 (exact)[3] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 "ENTSO-E Transparency Platform, Installed Capacity Per Production Unit". European Network of Transmission System Operators for Electricity. 2022. Retrieved April 1, 2022.
- ↑ https://web.archive.org/web/20141103174852/http://www.a-nossa-energia.edp.pt/centros_produtores/info_tecnica.php?item_id=34&cp_type=he§ion_type=info_tecnica.
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20220714154737/https://www.movhera.pt/en/miranda-hydropower-plant. Archived from the original on 14 July 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220714160203/https://www.edp.com/en/news/edp-concludes-sale-a-portfolio-6-hydro-plants-portugal-eu22-billion. Archived from the original on 14 July 2022.
{{cite web}}
: Missing or empty|title=
(help)